Location

Rare Earth Minerals Plc (LSE AIM: REM.LN) (RARMF: US), announces its interim results for the six months ended 30 June 2015 ("the period").

Chairman's Statement

I'm pleased to report that the Company's strategy of investing actively in the lithium and rare earth elements ("REE") sectors is starting to show solid growth, driven by the ever-increasing global market's focus on these sectors and REM's focus with its Joint Venture Partner on the development of the Sonora Lithium Project in northern Mexico.

The market performance of REM's portfolio of assets and investments delivered £2.65 million of total comprehensive income for the period.  This performance has also had a positive effect on our balance sheet with our net assets increasing from £15.63 million, at the end of December 2014 to £21.79 million at the end of the period. At the end of the period, Inclusive of our cash, equity swap agreement and undrawn conditional debt facilities the Company had approximately £9 million to support our current portfolio, potentially increase our investment within this portfolio and to identify new opportunities over the next twelve months.

Operationally, REM's principal investments have made excellent strides, and are demonstrating rapid growth as they advance up the development curve. In particular, and subsequent to the period end, REM and its partner in the Sonora Lithium Project entered into a conditional long-term lithium hydroxide supply agreement that is material to REM, the full details of which were set forth in the press release issued on 28 August 2015, which can be viewedhttp://www.rareearthmineralsplc.com/index.php?cID=287&id=13211514 .

This supply agreement will underpin and support the Company's plans to develop this globally significant lithium resource and will hopefully be the first of a number of potential lithium off-take partners. We are currently advancing additional potential off-take agreements with whom we have non-disclosure agreements with and we look forward to updating the market as we progress of these discussions.

The lithium market is approaching an important inflection point, with strong lithium battery growth fundamentals driving strong demand.  With limited supply capacity from the traditional producers, REM sees that it will be the new producers that will be asked to fill the widening supply gap. The progress on our key assets and investments over the last six months has been very strong and we look forward to reporting on the continued developments from these projects.

The Company remains completely focused on increasing its global exposure to the lithium supply chain with significant investments now centered on Sonora and one of the European Union's most significant lithium resource at the Cinovec Lithium Project in the Czech Republic on the border with Germany. Both deposits now have combined total indicated and inferred resources of nearly 13 million tonnes ("Mt") of lithium carbonate ("LCE").

Outlook

The past six months has been both significant for the projects we have invested in and the markets in which they operate. We will continue to look to add value to these assets. We believe that the investments that have been made by the Group have the potential to deliver excellent returns. The board would like to take this opportunity to thank our shareholders, staff and consultants for their valuable and continued support.

HIGHLIGHTS:

Sonora Lithium Project, Northern Mexico:

·      REM's holding in Bacanora Minerals Ltd ("Bacanora") increased from 12.0% to 17.02% (17 September 2015). Total economic interest in the Mexalit and Megalit licenses has increased form 38.4% to 41.91% (17 September 2015).

·      Updated mineral resource estimate ("MRE") is 226% larger than previously reported at 7.42 Mt of LCE").

·      Full pre-feasibility study ("PFS") is advancing on schedule and is due for completion in Q1 2016.

·      The ongoing development work and the resulting PFS are expected to be used to design a plant capable of potentially delivering up to 50,000 tonnes per year of LCE, making it one of the largest lithium producing mines in the world.

·      The MRE now totals 1.12 Mt of LCE within indicated category and 6.3 Mt of LCE within the inferred resource. Drilling is continuing to confirm grade and deposit continuity.

·      REM's chairman joined board of Bacanora as non-executive director alongside REM's chief executive officer.

Yangibana Rare Earth Minerals Project, Australia:

·      REM holds a 30% free carried interest to bankable feasibility study on the project.

·      MRE of 6.79 Mt at 1.52% Total Rare Earth Oxides ("TREO"). This is comprised of an Indicated portion of 3.96 Mt at 1.59% TREO and an Inferred portion of 2.83 Mt at 1.43% TREO.

·      Flotation tests resulted in 90% recovery of rare earths.

·      A scoping study, published in December 2014, had a indicative pre-tax Net Present Value of AU$ 900 million to AUS$1.2 billion based on 10 year mine life.

·      The PFS is due for completion in Q4 2015.

Cinovec Lithium Project, Czech Republic:

·      REM currently holds a 9.79% interest in the Cinovec lithium and tin deposit, located on the German border.

·      Inferred MRE of 5.5Mt LCE.

·      Lithium exploration target of 3.4 Mt to 5.3Mt of LCE.

·      Combined tin MRE of Indicated and Inferred portions of 183 kilotonnes (Inferred portion 167 kilotonnes  of tine and indicated portion 16 kilotonnes of tine)

Western Lithium, Nevada

·      REM holds approximately 1.35% (17 September 2015) interest in Western Lithium USA Corp ("Western Lithium"), which owns the Kings Valley Lithium Project in Nevada and the Cauchari – Olaroz Project in Argentina  (as a result of the recent merger with Lithium Americas Corp.).

·      Western Lithium have produced 99.8% lithium carbonate from a demonstration plant.

·      Lithium Americas combined MRE of 11.7Mt of LCE in Measured and Indicated Resources and 2.7Mt of LCE inProbable and Proven Reserves.

·      Initial commercial production from Cauchari – Olaroz Project is planned at a rate of about 20,000 tonnes per year of LCE when ultimately funded and completed.

·      The Cauchari – Olaroz Project is permitted for construction.

For further information please contact: 

Rare Earth Minerals Plc                                                                 +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Broker)                                  +44 (0) 207 220 1666

James Joyce

Mark Leonard

 

Square1 Consulting

David Bick/Mark Longson                                                             +44 (0) 207 929 5599

 

INVESTMENT AND OPERATIONS REVIEW:

Mexico – mineral resource

Within our investment portfolio, most notable is the prominence of Bacanora and our joint ownerships with this company on the Sonora Lithium Project. The combined NI 43-101 compliant gross resource now stands at a total of 7.24 Mt, with further conceptual extension within the current pit shell which could potentially add a further 2.4 to 4.6 Mt of LCE. Further drilling is ongoing with results to date confirming both grade and deposit continuity.

Lithium market developments

The lithium compound market continues to grow, with the battery sector forecast to be the primary driver for lithium demand. Based on the major battery manufacturers planned increase in manufacturing capacity it is anticipated that by 2020, global lithium battery capacity will have increased from the current 25 Giga Watt hours ("GWh") to approximately 110 GWh with stronger growth forecast post 2020.

This has led industry experts to forecast a lithium compound demand to grow at a 7.8% compound annual growth rate until 2025 from 180,000 tonnes today to around 410,000 tonnes in 2025. To put this into perspective, and given than most junior producers are talking about plants with a capacity of 20,000 tpa LCE, without additional production from the incumbent producers of today, REM management believe the market could require as many as 10 of these new plant in just the next 10 years, based on conservative projections.

Given management's belief that incumbent producers of lithium are limited in their ability to bring additional supply in short order to the market to satisfy growing demand, REM management believe the market will need junior producers to reach the market in order to satisfy lithium demand through 2020 and beyond.

As a result REM believes it seems likely that lithium prices will continue to march higher. Lithium has been one of the few commodities to enjoy price appreciation over the last five or six years, and given the forecast demand and supply dynamics, REM anticipates that this pattern will continue for the foreseeable future. In particular, battery grade lithiumcarbonate and lithium hydroxide should, REM believes, see strong price increases.

Australia – excellent progress on rare earth element pre-feasibility study

Subsequent to the 230% increase in MRE (from 45,000 tonnes to 103,000 tonnes of TREO) declared at Yangibana in December 2014, the pre-feasibility and expansion programme continued during the period.  This included the definition of considerable capital and operation cost savings based on improved recoveries, the applications and subsequent approvals of mining licenses and further exploration targets being identified.

Cinovec – large lithium and tin deposit in Europe

During the period we took an initial strategic stake in the Cinovec lithium and tin deposit, located on the border with Germany in the Czech Republic.  The Cinovec deposit has an Inferred MRE of 5.5Mt LCE and an exploration target of 3.4 Mt to 5.3Mt of LCE. In addition it has combined tin MRE of Indicated and Inferred portions of 183 kilotonnes of (Inferred portion of 167 kilotonnes of tin and indicated portion of 16 kilotonnes of tin). This substantial resource is proximate to end market in Europe in particular OEM's in the electric vehicle market and we look forward to assisting the management team developing this deposit over the coming year.

Western Lithium, Nevada

Western Lithium's Kings Valley Lithium Project in Nevada produced high purity lithium carbonate (99.8%) from its demonstration plant in Germany and also further developed their process design for the production of lithium hydroxide, with Bateman technologies. Subsequent to the period end Western Lithium agreed a merger with Lithium Americas whom are developing the third largest lithium brine deposit in the world with a combined MRE of 11.7Mt of Measured and Indicated Resources and 2.7Mt of Probable and Proven Reserves. Lithium Americas have signed heads of terms with POSCO defining the basic conditions for a joint venture to develop the Cauchari-Olaroz Lithium Project in Argentina.

PROJECTS

Sonora Lithium Project

Sonora is a large clay hosted Lithium deposit in the Sonora State some 190 kilometres northeast of Hermosillo and 200 kilometres south of the border with the USA.

Sonora is underlain by Oligocene to Miocene age rhyolitic tuffs, ignimbrites and breccias of the upper volcanic complex of the Sierra Madre Occidental. This succession was subjected to Basin and Range extensional normal faulting during Miocene times that resulted in the development of a series of half-grabens. The half-grabens are locally filled with fluvial-lacustrine sediments and intercalated tuffs. Alkaline volcanism around this time is thought to have contributed lithium and other alkali metals into these basins. Quaternary basalt flows cover the basinal sediment and volcaniclastic rocks succession, except where later faulting and uplift have exposed the basin infill. Mineralisation on the concessions consists of lithium-bearing clays localised in lacustrine basins.

Sonora consists of ten contiguous concessions covering 94,186 hectares. Two of the concessions (La Ventana, La Ventana 1) are owned 100% by Bacanora. The El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions are owned by Bacanora's subsidiary Mexilit SA de CV (which is owned 70% by Bacanora and 30% by REM) ("Fleur & El Sauz"). The San Gabriel, Buenavista, and Megalit concessions are owned by Bacanora's subsidiary, Megalit SA de CV (which is owned 70% by Bacanora and 30% by REM) ("Megalit"). REM has the option to negotiate an increase to its interest of up to 49.9% of Megalit under terms and consideration yet to be agreed upon. This option expires on January 12, 2016.

When REM's ownership of 17.02% of Bacanora is aggregated with REM's 30% direct interest of the companies that hold the ten mining concessions, REM has a 41.91% economic interest in these assets.

During the period Bacanora announced a revised MRE for Sonora. Highlights from the increased MRE Include:

·     Indicated portion of the MRE is gross 1.12Mt LCE contained in 95Mt of clay, at lithium ("Li") grade of 2,200 ppm.

·     Inferred portion of the MRE is gross 6.3Mt LCE contained in 500Mt of clay at a Li grade of 2,300 ppm.

·     Conceptual extensions within current pit shell have the potential to add 2.4 to 4.6Mt LCE contained in 300 to 250Mt of clay at a Li grade of approximately 1,500 to 2,500 ppm.

·     This MRE (which has been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101")) does not include identified grade and tonnages contained within the Beunavista concession, as further metallurgical testing is required on this deposit; and

·     This updated MRE has been developed using a 3D geological model and Kriged grade estimates. The indicated portion of the MRE will be used for initial open pit mine design while we further develop the inferred portion of the MRE.

Progress on each of the major concessions (and REM's economic interest) is detailed below:

La Ventana – (17.02% economic interest REM – 17 September 2015)

Progress over the last 6 months progress at La Ventana has continued as we had anticipated. Drilling and development work that was completed earlier in the year was used to calculate an expanded and updated MRE published in May 2015.

The updated MRE of La Ventana, using a cut off of 450 ppm lithium is comprised of an Indicated portion estimated at 70Mt, averaging 2,400 ppm Li, for 0.89Mt of LCE, in addition to an Inferred portion estimated at 135Mt averaging 1,800 ppm Li, for 1.30Mt of LCE. These resources were prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101").

Fleur & El Sauz- (41.91% economic interest REM – 17 September 2015)

 The contiguous El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions cover the 34 square adjacent to and along strike from the La Ventana concessions. The geology represents a strike extension of La Ventana, and has very similar geology and structural controls.

Excellent progress has been made in the development of these concessions. This cumulated in an expanded and updated MRE published in May 2015. The updated MRE of Fleur & El Sauz using a cut off of 450 ppm lithium is comprised of an Indicated portion estimated at 25Mt, averaging 1,600 ppm Li, for 0.23Mt of LCE, in addition to an Inferred portion estimated at 375Mt averaging 2,500 ppm Li, for 5Mt of LCE. These resources were prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101").

During the period a 4,000 metre drilling programme began on the Fleur and El Sauz concessions with the primary objective of significantly increasing the indicated mineral resources. Initial results published in September confirmed both the high grade (up to 2.68% LCE) and continuity of the deposit.

Upon completion of the drill programme and assaying, SRK will deliver an updated resource model for mine design purposes, with an initial focus on the higher grade, open pit resources on the La Ventana and Fleur concessions.

Work is ongoing in relation to the completion of a pre-feasibility study for the whole of Sonora. This is scheduled for completion in Q 2016.

Sonora Lithium Pilot Plant Work & Project Development Work

During the period metallurgical testing within the pilot plant continued. SGS Canada Inc. ("SGS") was appointed to carry out lithium carbonate metallurgical test work, at their Lakefield site, on a number of ore samples from the Sonora Lithium Project concessions. SGS is one of the world's leading inspection, verification, testing and certification companies, with proven expertise in lithium metallurgy. The data from this test work will be used to produce a detailed lithium carbonate flowsheet. In addition work is continuing on the development of a lithium hydroxide, (LiOH) flowsheet at its Hermosillo pilot plant and will also commence preliminary test work with a number of international specialist groups with LiOH extraction expertise.

Ausenco Engineering Canada Inc., ("Ausenco") was appointed to carry out the flow sheet review, process engineering design, infrastructure optimisation and PFS documentation for a two-stage lithium carbonate processing plant, for the production of battery grade lithium carbonate. Ausenco is internationally recognised as a specialist in the study, engineering, procurement, construction management, programme management, commissioning and operation of minerals processing projects. They recently completed an updated Feasibility Study for Talison Lithium's lithium carbonate plant in Australia and will manage Bacanora's PFS out of their office in Hermosillo, Mexico with support from Vancouver, Canada and Perth, Australia.

Yangibana Project, Australia (REM-30% free carry)

Since December 2011 REM has owned a 30% interest in the Yangibana rare earth project situated in the Gascoyne region of Western Australia. REM's interest is free carried up to the commencement of the bankable feasibility study on Yangibana

Yangibana is centered on narrow, discontinuously outcropping ironstone dykes that have been shown to carry anomalous REE associated with monazite mineralisation. The REE comprise 15 elements with atomic numbers between 57 and 71, plus scandium and yttrium. The heavy rare earth oxides comprise the oxides of europium, gadolinium, terbium, dysprosium, holmium, erbium, thulium, ytterbium, lutetium and yttrium. The light rare earth oxides comprise the oxides of lanthium, cerium, praseodymium, neodymium and samarium.

Hastings Rare Metals Limited ("Hastings") is the manager of the Project and holds a 60% interest. REM is free carried by Hastings through to the commissioning of a bankable feasibility study. In November 2014 the total resource significantly increased by 230% from 45,000 contained tonnes TREO to 103,000 contained tonnes. The total project resources increased from 3.36 Mt at 1.34% TREO as reported in August 2014 to 6.79 Mt at 1.52% TREO. 

Following on from the revised resource statement, Snowden Mining, consultants to the project, published an independent scoping study. It reported an indicative pre-tax NPV of AU$900 million to AU$1.2 billion based on open pit mining at 1.0 million tpa over a 15-year period. The internal rate of return of the project is estimated at 62.5%, with an estimated Capex of approximately $390 million and a payback within 1.6 years of start of production. The scoping study was based on Yangibana production of approximately 2,700 tpa of neodymium oxide, 750 tpa of praseodymium oxide, 40 tpa of dysprosium oxide and 70 tpa of europium oxide. Significantly, the resource remains open in all directions with mineralisation cropping out to the east and west.

Project development progressed well during the six months with the appointment of the engineering team and commencement of the PFS, which is due for completion in Q1 2015. Beneficiation testing achieved 90% recovery of rare earths into 7% of original mass with a >13 times increase in rare earths grade to >20% TREO. These results indicate potential to significantly reduce capital and operating coast associated with the processing plant and it would only be required to treat 70,000 tpa as opposed to the original 200,000 tpa. Post period end, mining Licenses were granted over Yangibana Main which contained the following mineral resources:

·          Yangibana North – JORC Indicated Resources of 2.73 million tonnes at 1.75%TREO** with 0.58%Nd2O3-Eq* and Inferred Resources of 0.73 million tonnes at 1.65%TREO** with 0.55% Nd2O3-Eq*

·          Gossan – JORC Inferred Resources of 0.23 million tonnes at 1.39%TREO** with 0.43% Nd2O3-Eq*

·          Lion's Ear – JORC Inferred Resources of 0.67 million tonnes at 1.55%TREO** with 0.50% Nd2O3-Eq*

·          Hook  – JORC Inferred Resources of 0.10 million tonnes at 1.93%TREO** with 0.52% Nd2O3-Eq*

·          Kane's Gossan – JORC Inferred Resources of 0.61 million tonnes at 1.18%TREO** with 0.41% Nd2O3

 

Nd2O3-Eq*

The Nd2O3 equivalent (Nd2O3-Eq) values have been calculated using a mixture of prices for Nd2O3, Pr2O3, y2O3 and Eu2O3 as laid out in the Hastings release dated 19 August 2015 .

TREO**

The sum of the oxides of the heavy rare earth elements (HREO) and the light rare earth elements (LREO).

 

Cinovec Lithium and Tin project, Czech Republic (9.79%) owned by REM – 17 September 2015

At the end of June 2015 REM acquired an initial strategic interest in one of the largest lithium deposits in Europe, the Cinovec deposit in the Czech Republic through a direct holding in the share capital of European Metals Holdings Limited (ASX code: EMH) ("European Metals") that owns 100 per cent of the exploration rights to the Cinovec lithium/tin deposit.

The Cinovec lithium and tin deposit is located in the Krusne Hory, a mountain range that straddles the border between Germany and the Czech Republic. The district has an extensive mining history, with various metals having been extracted since the 14th Century.

The Cinovec lithium-tin deposit is intimately associated with the cupola of the Cinovec- Zinnwald granite and comprises an irregular metasomatic greisen and greisenised granite zones from several tens to hundreds of metres thick that follow, and are located near or at, the upper contact of the cupola and thin, flat greisen zones enclosing quartz veins up to 2m thick. The Cinovec deposit has an Inferred MRE of 5.5Mt LCE and an exploration target of 3.4 Mt to 5.3Mt of LCE. In addition it has a combined tin MRE of Indicated and Inferred portions of 183 kilotonnes (Inferred portion of 167 kilotonnes of tin and indicated portion of 16 kilotonnes of tin)

Western Lithium (1.35 % owned by REM -17 September 2015)

Western Lithium is developing a major lithium deposit in Northwest Nevada.  The Kings Valley deposit, as it is known, contains a total proven and probable reserve of 570,000 tonnes of LCE. Based on its NI 43-101 Prefeasibility Study, the Kings Valley project is forecast to have a comparably low first-quartile cost structure against new and incumbent lithium producers, and to generate a net present value of US$552 million at a discount rate of 8%.

In February 2015, Western Lithium announced that it had produced a high quality lithium carbonate (99.8%) from its demonstration plant in Germany and also further developed their process design for the production of lithium hydroxide, with Bateman technologies.

The most significant development for Western Lithium was the announcement of its merger with Lithium Americas in July, which completed on the 8 September 2015. As a result of the Western Lithium acquired all of the issued and outstanding common shares of Lithium Americas in exchange for 0.789 common shares of Western Lithium for each Lithium Americas Share held. Western Lithium has issued an aggregate of 130,847,374 common shares of Western Lithium to the former shareholders of Lithium Americas.  On completion of the merger, Western Lithium has 265,648,063 shares issued and outstanding, with former Lithium Americas shareholders holding approximately 49.3% on an undiluted basis.

The combined entity will control two large and geographically diversified development stage lithium projects which allows for an orderly development timeline that commences with Hectatone TM business revenues in 2015, followed by potential revenues from Cauchari-Olaroz under a contemplated two year development timeline, and potential revenues from Kings Valley under a contemplated four year development timeline.

Lithium Americas has completed a NI 43-101 compliant feasibility study on its Cauchari-Olaroz Lithium Project in Jujuy, Argentina. The asset has combined MRE of 11.7 Mt of LCE in Measured and Indicated Resources and 2.7 Mt of LCE in Probable and Proven Reserves. The project has already been permitted for construction and is planned to have an initial production rate of 20,000 tpa of LCE. In addition Lithium Americas have signed heads of terms with POSCO defining the basic conditions for a joint venture to develop the Cauchari-Olaroz Lithium Project.

FINANCIAL RESULTS:

During the period the Group made a loss before taxation of £1.21 million (6 months ending 30 June 2014: loss £0.19 million year ending 31 December 2013: loss £3.07 million). There was a basic loss per share of 0.02p (30 June 2014: loss per share 0.00p, 31 December 2013: loss per share 0.06p). As a result of increases in the value of available for sale assets comprehensive income for the period was £2.65 million (30 June 2014: total comprehensive income of £0.26 million, 31 December 2014 total comprehensive income of £3.67 million).

The total assets of the Group increased from £15.63 million at the end of last year (31 December 2014) to £21.79 million. Of this amount £12.74 million represent the market value of our investments at the period end.

During the period our net cash outflow from operating activities was £0.77 million, which was lower than the £0.96 million during the same period last year. We invested £3.18 million in available for sale assets which represented the vast majority of the net cash outflow from investing activities.

These investments plus other costs were funded by cash flows from investing activities totaling £4.16 million. This included £2.50 million of proceeds from the issue of share capital, which was completed in January 2015 and continued proceeds of £1.04 million from the settlement of the share swap between the Group and YA Global Master SPV, Ltd ("YAGM").

At the period end the Company had approximately £5.48 million of its US$ 10 million debt facility with YAGM available for drawn down, the individual drawdowns are subject to approval by YAGM. This facility will expire in June 2016. In addition, and based on the share price of the Company at the end of the period the amounts due under share swap within one year (Derivative Financial Instrument) was £2.20 million. The amount due under the share swap are dependent on the price of the Company's securities during the preceding month in which the swap payment is due. These two amounts along with our £1.65 million in cash and cash equivalents totals approximately £9.34 million of cash available to the Company within twelve months.

 

RARE EARTH MINERALS PLC

CONDENSED CONSOLIDATED INTERIM STATEMENT OF COMPREHENSIVE INCOME

FOR THE PERIOD ENDED 30 JUNE 2015 (UNAUDITED)

 

 

Notes

Unaudited Period ended 30 June 2015

 

Unaudited Period ended 30 June 2014 (restated)

 

Audited Year ended 31 December 2014

 

 

£'000

 

£'000

 

£'000

 

 

 

 

 

 

 

Other administrative expenses

 

(1,000)

 

(641)

 

(3,173)

 

 

 

 

 

 

 

Total administrative expenses

 

(1,000)

 

(641)

 

(3,173)

Operating (loss)

 

(1,000)

 

(641)

 

(3,173)

 

 

 

 

 

 

 

Share of associates losses

 

(10)

 

 

(19)

(Loss)/gain on equity swap settlements

 

(97)

 

456

 

456

Finance cost

 

(110)

 

(6)

 

(342)

Loss before taxation

 

(1,217)

 

(191)

 

(3,078)

 

 

 

 

 

 

 

Taxation

 

 

 

 

 

 

 

 

 

 

Loss attributable to the equity holders of the Company

 

(1,217)

 

(191)

 

(3,078)

 

 

 

 

 

 

 

Other comprehensive income

 

 

 

 

 

 

Foreign currency translation differences

 

274

 

17

 

(61)

Fair value adjustment of equity swap

 

(130)

 

 

(389)

Transfer to income statement of hedging & available for sale asset reserve

 

 

(580)

 

(580)

Increase in value of available for sale asset

 

3,723

 

1,009

 

429

Other comprehensive income (expenditure) for the period net of tax

 

3,867

 

446

 

(601)

 

 

 

 

 

 

 

Total comprehensive income (expenditure) for the period

 

2,650

 

255

 

(3,679)

 

 

 

 

 

 

 

Loss per share

 

 

 

 

 

 

Basic & Diluted (pence per share)

2

(0.02)

 

(0.004)

 

(0.06)

 

 

RARE EARTH MINERALS PLC

CONDENSED INTERIM CONSOLIDATED STATEMENT OF CHANGES IN EQUITY

FOR THE PERIOD ENDED 30 JUNE 2015 (UNAUDITED)

 

 

Share capital

Share premium account (restated)

Share-based payment reserve

Available for sale asset reserve

Hedging & Exchange reserve

Retained earnings

Total equity

 

£'000

£'000

£'000

£'000

£'000

£'000

£'000

 

 

 

 

 

 

 

 

Balance at 1 January 2014

819

8,699

500

(203)

456

(5,326)

4,945

Issue of share capital

143

5,203

5,346

Share issue costs

(260)

(260)

Transfer on exercise of options

(106)

106

Share based payments

90

90

Transactions with owners

        143

4,943

(16)

106

     5,176

Foreign exchange

17

17

Transfer to income statement

                –  

(580)

(580)

Increase in value of available for sale asset

 –

 –

1,009

 –

1,009

Loss for the period

(191)

(191)

Total comprehensive loss for the period

            –  

              –  

            –  

1,009

(563)

(191)

255

Balance at 30 June 2014 (unaudited) (restated)

962

13,642

484

806

(107)

(5,411)

10,376

Issue of share capital

105

6,923

7,028

Share issue costs

 

(700)

 

(700)

Share based payments

1,756

1,756

Transactions with owners

        105

       6,223

1,756

                –  

              –  

            –  

     8,084

Foreign exchange

(78)

(78)

Fair value adjustment of equity swap

                –  

(389)

(389)

Decrease in value of available for sale asset

(580)

(580)

Loss for the period

(2,887)

(2,887)

Total comprehensive loss for the period

            –  

(580)

(467)

(2,887)

(3,934)

Balance at 31 December 2014

1,067

19,865

2,240

226

(574)

(8,298)

14,526

Issue of share capital

31

2,468

2,499

Share based payments

133

133

Transactions with owners

          31

       2,468

133

                –  

              –  

            –  

     2,632

Foreign exchange

 –

 –

274

 –

274

Fair value adjustment of equity swap

                –  

(130)

(130)

Increase in value of available for sale asset

 –

 –

3,723

 –

3,723

Loss for the period

(1,217)

(1,217)

Total comprehensive loss for the period

            –  

3,723

144

(1,217)

2,650

Balance at 30 June 2015 (unaudited)

1,098

22,333

2,373

3,949

(430)

(9,515)

19,808

 

RARE EARTH MINERALS PLC

CONDENSED CONSOLIDATED INTERIM STATEMENT OF FINANCIAL POSITION

AS AT 30 JUNE 2015 (UNAUDITED)

 

 

 

Unaudited

 

Unaudited

 

Audited

 

 30 June 2015

 

 30 June 2014

 

31 December 2014

 

 

 

 

(restated)

 

 

Assets

 

£'000

 

£'000

 

£'000

 

 

 

 

 

 

 

Non-current

 

 

 

 

 

 

Intangible assets

 

1,146

 

690

 

1,174

Investment in associate

 

2,932

 

2,259

 

2,933

Total non-current assets

 

4,078

 

2,949

 

4,107

 

 

 

 

 

 

 

Current assets

 

 

 

 

 

 

Trade and other receivables

 

1,114

 

1,338

 

1,047

Derivative financial instrument

 

2,207

 

 

3,311

Available for sale asset

 

12,744

 

3,922

 

5,708

Cash and cash equivalents

 

1,656

 

4,092

 

1,463

Total current assets

 

17,721

 

9,352

 

11,529

 

 

 

 

 

 

 

Total assets

 

21,799

 

12,301

 

15,636

 

 

 

 

 

 

 

EQUITY AND LIABILITIES

 

 

 

 

 

 

Current liabilities

 

 

 

 

 

 

Trade and other payables

 

607

 

296

 

475

Borrowings

 

1,384

 

1,629

 

635

Total current liabilities and total liabilities

 

1,991

 

1,925

 

1,110

 

 

 

 

 

 

 

Equity

 

 

 

 

 

 

Share capital

 

1,098

 

962

 

1,067

Share premium

 

22,333

 

13,642

 

19,865

Share based payment reserve

 

2,373

 

484

 

2,240

Available for sale asset reserve

 

3,949

 

806

 

226

Hedging & Exchange reserve

 

(430)

 

(107)

 

(574)

Retained earnings

 

(9,515)

 

(5,411)

 

(8,298)

 

 

 

 

 

 

 

Total equity and liabilities

 

 

 

 

 

 

to owners of the company

 

19,808

 

10,376

 

14,526

 

 

 

 

 

 

 

Total equity and liabilities

 

21,799

 

12,301

 

15,636

 

 

RARE EARTH MINERALS PLC

CONDENSED INTERIM CONSOLIDATED CASH FLOW STATEMENT

FOR THE PERIOD 30 JUNE 2015 (UNAUDITED)

 

 

 

Unaudited Period ended

 

Unaudited Period ended

 

Audited

Year ended

 

 

30 June 2015

 

30 June 2014

 

31 December 2014

 

 

 

 

(restated)

 

 

 

 

£'000

 

£'000

 

£'000

Cash flows from operating activities

 

 

 

 

 

 

Operating loss

 

(1,000)

 

(641)

 

(3,173)

Amortisation of intangibles

 

23

 

24

 

49

Equity settled share-based payments

 

133

 

90

 

1,846

Fees settled in shares

 

 

94

 

(Increase) in trade and other receivables

 

(67)

 

(600)

 

(359)

Increase in trade and other payables

 

 132

 

   75

 

248

Net cash outflow from operating activities

 

(779)

 

(958)

 

(1,389)

 

 

 

 

 

 

 

Cash flows from investing activities

 

 

 

 

 

 

Net payments for investment in associate

 

 

(763)

 

(1,456)

Payments for investments in AFS assets

 

(3,184)

 

(2,219)

 

(4,580)

Investment in exploration

 

(9)

 

 

(539)

Receipt on sale of AFS assets

 

 

 

Net cash outflow from investing activities

 

(3,193)

 

(2,982)

 

(6,575)

 

 

 

 

 

 

 

Cash flows from financing activities

 

 

 

 

 

 

Proceeds from issue of share capital

 

2,500

 

5,252

 

12,280

Proceed from settlement of share swap

 

1,048

 

456

 

506

Investment in share swap

 

 

 

(3,700)

Net borrowings

 

727

 

1,629

 

682

Finance cost

 

(110)

 

(6)

 

(342)

Share issue costs

 

 

(260)

 

(960)

Net cash inflow from financing activities

 

                    4,165

 

                     7,071

 

8,466

 

 

 

 

 

 

 

Net increase in cash and cash equivalents

 

193

 

3,131

 

502

Cash and cash equivalents at beginning of period

 

1,463

 

961

 

961

Cash and cash equivalents at end of period

 

1,656

 

4,092

 

1,463

 

 

NOTES TO THE CONDENDED INTERIM FINANCIAL INFORMATION

FOR THE PERIOD ENDED 30 JUNE 2015 (UNAUDITED)

 

1              BASIS OF PREPARATION

 

The condensed consolidated interim financial information for the period ended 30 June 2015 has not been audited or reviewed in accordance with the International Standard on Review Engagements 2410 issued by the Auditing Practices Board. The figures were prepared using applicable accounting policies and practices consistent with those adopted in the statutory accounts for the period ended 31 December 2014. The figures for the period ended 31 December 2014 have been extracted from these accounts, which have been delivered to the Registrar of Companies, and contained an unqualified audit report.

 

The condensed consolidated interim financial information contained in this document does not constitute statutory accounts. In the opinion of the directors the financial information for this period fairly presents the financial position, result of operations and cash flows for this period.

 

The Condensed Consolidated Interim Financial Information was approved by the Board of Directors on 17 September 2015.

 

Statement of compliance

 

These condensed consolidated interim financial statements have been prepared in accordance with International Financial Reporting Standards (IFRS) as adopted by the European Union with the exception of International Accounting Standard ('IAS') 34 – Interim Financial Reporting. Accordingly the interim financial statements do not include all of the information or disclosures required in the annual financial statements and should be read in conjunction with the Company's 2014 annual financial statements.

 

2              LOSS PER SHARE 

 

The calculation of the loss per share is based on the loss attributable to ordinary shareholders divided by the weighted average number of shares in issue during the period.

 

 

Unaudited

 

Unaudited

 

Audited

 

six months ended

 

six months ended

 

year ended

 

30 June 2015

 

30 June 2014

 

31 December 2014

 

 

 

(restated)

 

 

 

£'000

 

£'000

 

£'000

 

 

 

 

 

 

Loss on ordinary activities after tax (£'000)

(1,217)

 

(191)

 

(3,078)

 

 

 

 

 

 

Weighted average number of shares for calculating basic loss per share

  6,789,755,704

 

  4,789,386,747

 

             5,219,766,921

 

 

 

 

 

 

Basic and diluted loss per share (pence)

(0.02)

 

(0.004)

 

(0.06)

The share options are anti-dilutive, as a consequence of the loss for the period.

 

 

3              EVENTS AFTER THE END OF THE REPORTING DATE.

On 31 July 2015, Kiran Morzaria was appointed as a Director of the Company.

 

On 2 September 2015, the Company announced that it had increased its shareholding in Bacanora Minerals Ltd to 16.8%, through on market purchases totalling £324,530.

 

On 17 September 2015, the Company announced that it had increased its shareholding in Bacanora Minerals Ltd to 17.02%, through on market purchases totalling £181,405

 

4              A copy of this interim statement is available on the Company's website www.rareearthmineralsplc.com.

Original Article: http://www.rareearthmineralsplc.com/index.php?cID=287&id=13222603

SHARE THIS POST?

Facebook
Twitter
LinkedIn
WhatsApp
Telegram
Email