Location

Vancouver, Canada — December 13, 2011 – Endeavour Silver Corp. (NYSE: EXK, TSX: EDR, Frankfurt: EJD) announces that exploration drilling east of the Lucero-Karina-Fernanda-Daniela mine area at Endeavour’s Guanajuato Mines project in Guanajuato State, Mexico has discovered two new high grade silver-gold veins.

Drilling highlights in the La Joya vein include 463 grams per tonne (gpt) silver and 6.83 gpt gold over 2.00 meters (m) true width (24.1 ounces per ton (opT) silver equivalent (based on a silver: gold ratio of 53:1) over 6.6 feet (ft)) in hole LJ15S-1. Drilling highlights in the Belen vein include 497 gpt silver and 5.19 gpt gold over 1.08 m true width (22.5 opT silver equivalent over 3.5 ft) in hole BL0-3.

Drill results are as follows:

LA JOYA DRILL RESULTS



























































































































































































Hole

Vein

From

Core Length

True Width

Ag

Au

(m)

(m)

(m)

(g/t)

(g/t)

LJ6-1

Hw La Joya

185.40

5.75

5.34

244.1

1.71

Incl

185.40

0.45

0.39

1,235.0

2.21

LJ6-2

Vein

83.60

0.35

0.30

516.0

0.91

Breccia

150.70

0.70

0.35

241.0

1.04

Hw La Joya

202.90

2.10

2.12

105.9

1.35

La Joya Vein

292.05

1.85

1.78

16.2

2.17

LJ6-3

Breccia

94.00

1.30

1.00

205.1

2.03

Vein

96.85

0.30

0.25

50.0

3.73

Vein

150.20

0.35

0.18

259.0

3.88

LJ8-1

La Joya

363.30

2.00

1.88

244.0

0.93

Incl

363.80

0.20

0.19

2,260.0

8.65

LJ8-2

Vein

233.80

0.45

0.19

343.0

1.07

Hw La Joya

282.60

4.95

4.87

119.0

0.68

LJ10-1

La Joya

266.20

1.95

1.50

323.1

11.42

Vein

289.45

0.30

0.28

298.0

1.43

LJ14S-1

La Joya Vein

123.90

3.45

2.22

190.3

0.10

Incl

126.55

0.80

0.51

740.0

0.35

LJ15S-1

La Joya South

169.95

2.60

1.99

462.7

6.83

Incl

171.95

0.60

0.46

725.0

21.10

Vein

174.20

0.25

0.18

311.0

3.61

LJ16S-1

Vein

90.30

0.45

0.26

434.0

1.71

La Joya Vein

109.45

1.80

1.16

251.0

0.69

Vein

186.60

0.40

0.36

1,185.0

2.38


BELEN DRILL RESULTS


































































































































































Hole

Vein

From

Core Length

True Width

Ag

Au

(m)

(m)

(m)

(g/t)

(g/t)

BL4S-1

Belen

44.75

6.60

5.43

72

1.96

Incl

47.50

0.60

0.46

178

5.67

Vein

52.20

2.10

1.89

15

1.38

BL3S-1

Belen

95.40

3.25

2.69

53

1.95

BL3S-2

HW Belen

110.15

2.20

2.10

105

1.73

Incl

110.85

0.80

0.79

252

4.38

BL3S-3

HW Belen

125.25

4.50

3.10

116

2.51

BL2S-1

Belen

129.75

5.85

4.69

57

1.03

BL2S-2

Belen

153.10

1.95

1.83

183

3.06

BL2S-3

Belen

205.30

2.45

1.51

113

1.03

BL2S-4

Belen

70.50

1.70

1.68

120

2.43

BL1S-1

Belen

175.55

1.85

0.78

128

8.33

BL1S-3

HW Belen

79.25

2.20

2.19

116

4.83

Vein

82.35

1.95

1.51

21

1.39

Vein

88.90

1.90

1.77

20

1.95

Belen

95.00

2.10

1.94

32

2.02

BL0-2

Vein

225.80

1.25

1.12

167

2.33

BL0-3

Vein

228.05

1.65

1.08

497

5.19

Incl

228.05

0.25

0.14

905

4.99


Barry Devlin, Vice President Exploration for Endeavour, commented: “Our recent discovery of new high grade silver-gold mineralized zones in the La Joya and Belen veins is yet another indication of the untapped exploration potential of Endeavour’s properties in this prolific silver-gold mining district. Two drill rigs continue to work in Guanajuato drilling the northern extent of the Daniela vein, and testing several other attractive drill targets in the La Luz sub-district.” To view maps of the area click here.

“As a result of our new discoveries this year, Endeavour anticipates there will be a substantial increase in reserves and resources at Guanajuato at year-end. This should allow management to undertake the next phase of mine expansion in 2012 from 1000 tonnes per day (tpd) up to 1600 tpd at Guanajuato. In 2011, Endeavour completed a major expansion of the Guanajuato plant from 600 tpd to 1600 tpd on time and budget and the plant successfully ramped up throughput to 1000 tonnes per day in October.”

Barry Devlin, M.Sc., P.Geo. Vice President, Exploration is the Qualified Person who reviewed this news release and supervised the drilling programs on the Guanajuato Mine properties. A Quality Control sampling program of reference standards, blanks and duplicates has been instituted to monitor the integrity of all assay results. All samples were split at the Guanajuato field office and shipped to ALS-Chemex Labs, where they are dried, crushed, split and 50 gram pulp samples are prepared for analysis. Gold and silver are determined by fire assay with an atomic absorption (AA) finish and other elements are determined by AA.

ENDEAVOUR SILVER CORP.
Per:

/s/ “Bradford J. Cooke”

BRADFORD COOKE
Chairman and CEO

SHARE THIS POST?

Facebook
Twitter
LinkedIn
WhatsApp
Telegram
Email