Colibri Reports Drill Results of 56.4 Metres of 1.0 g/t Gold – Including 9.2 Meters of 5.3 g/t Gold at 4-T Target on the Pilar Gold and Silver Project in Sonora
“Today’s results are the best from the 4-T Trend to date and rank as a top five drill intersect in Tocvan’s history of drilling at Pilar. Gold mineralization intersected in hole JES-24-77 is close to surface, projecting to workings exposed along a low rolling ridgeline much like the Main Zone.”