Excellon Provides Mexican Exploration Update and Exceeds November Production Targets at Platosa
Exploration Highlights:
Hole LP965 drilled between the two main portions of the 623 Manto intersected 1,955 g/t (57 oz/T) Ag, 14.99% Pb, 28.76% Zn over 4.08 metres (m);
Hole LP971 drilled east of the 623 Manto in a relatively open area intersected 1,028 g/t (30 oz/T) Ag, 10.47% Pb, 12.74% Zn over 4.53 m;
Production Highlights:
Tonnage milled in November was 6,800 tonnes which exceeded budget by 35%;
Silver production was 227,000 oz which exceeded budget by 95%.