Category: Exploration and Development

Alien Metals Ltd. – 78m Sulphide Bearing Zone Intersected at Donovan 2 Cu-Au Project

Bill Brodie Good, CEO & Technical Director of Alien Metals, commented: “We are very pleased to see this initial drilling at San Celso and Donovan 2 intersect showing encouraging zones of alteration. The Donovan 2 drilling has returned some strong disseminated sulphide intersections, which is highly promising for the potential presence of a VMS type mineralised system.”

Pan American Silver Extends Mineralization at the La Colorada Skarn Project

“We drilled more metres on the skarn in the first quarter of 2022 than during any other quarterly period, with infill drilling increasing our confidence in the central skarn resource and exploration drilling further defining the extensions to the east, south and west,” said Christopher Emerson, Pan American’s Vice President Business Development and Geology.

GSilver Drills 2,988 GPT AgEq Over 0.35m Estimated True Width at El Cubo

“These results serve to build confidence in our understanding of geological controls of high-grade mineralisation within the various veins and different zones of our Guanajuato mine holdings. Further, drilling at the El Cubo mine continues to identify mineralisation that the Company can quickly build into its near-term mining plans,” commented James Anderson, Chairman and CEO of Guanajuato Silver.

Golden Tag Drills 93 g/t Ag.Eq over 395 m Expanding Fernandez Zone 70 m to Northwest

Greg McKenzie, President and CEO commented: “We are pleased to discover that the Fernandez Zone extends 70 metres to the northwest as measured from the previous most westerly hole. We can see that the continuity of mineralization on the western side is really remarkable as we have encountered 395 metres of mineralization with a maximum internal dilution of only 4.5 metres.”

Aztec – Kootenay JV Reports Drill Intercept of 0.32 gpT Au over 24.3 metres and 6.1 metres of 1.649 gpT Au at California North Prospect, 350 m North of California Zone, Cervantes Project, Sonora, Mexico

The Aztec-Kootenay JV has now completed its Phase 2 Reverse circulation program of 26 holes, totaling 4,649 metres at the Cervantes Property. Drilling commenced in December 2021. The planned drill testing of the four main targets of the Cervantes phase 2 drilling program is now complete.

All News