Argentum Silver Corp. has commenced a second phase drilling program at its 1053-hectare Coyote Property in the State of Jalisco, Mexico. The second phase diamond drill program is aimed at demonstrating grade and thickness continuity on the El Tajo vein as well as some scout drilling on the La Colorada and La Valenciana veins. Sixteen drill holes are planned totaling 2,000 metres. Combined, the El Tajo and La Colorada veins have been traced for over a 900 metre strike length on surface. In addition, a new vein system called La Valenciana has been defined approximately 750 metres to the south-west of El Tajo. The La Valenciana vein system is traceable on surface for over 450 metres as a series of exposures and underground workings supported by trenching, geophysics, and soil and rock sampling.