Category: Exploration and Development

Tocvan Diagnostic Leach Study Reports High Percentage of Recoverable Gold and Silver

“These results far surpass our expectations and provide us with new insight on the optimization of gold and silver recovery at Pilar” stated Brodie Sutherland, CEO. “To have such a large percentage of the gold and silver free and accessible for multiple recovery methods allows us to evaluate the most efficient ways to develop the project.”

Oroco Continues South Zone Success With 221.7m of 0.45% Cu Equivalent

Richard Lock, Oroco’s CEO, commented: “I am very pleased to say that the overall Santo Tomas 2022-2023 drilling program has validated my decision to join Oroco approximately one year ago. The project is clearly meeting my expectations as a highly attractive acquisition target and I look forward to this assessment being further substantiated with the upcoming release of an updated Mineral Resource Estimate and the Preliminary Economic Assessment which will follow.”

GoGold Releases Los Ricos South Drilling Results

“We continue to be impressed with the results which we’re seeing from Los Ricos South, particularly in the Eagle deposit. Hole 126 is a great example of why we believe this deposit is so special – as it has excellent grades over wide intercepts,” said Brad Langille, President and CEO.

Southern Silver Provides Mineral Resource Update that Includes Newly Identified Shallow High-grade Deposit at the Cerro Las Minitas Project

Vice President of Exploration, Rob Macdonald stated “ This latest resource update represents one more step in the continued evolution of the Cerro La Minitas project through the identification of further shallow, high-grade mineralization which is accretive to the existing mineral resources on the property and adjacent to the planned project infrastructure.”

Discovery Intercepts 241 g/t AgEq over 39 m in Feasibility Study Drilling at Cordero

Tony Makuch, CEO, states: “Our recent Pre-Feasibility Study outlined the potential for Cordero to become a top three primary silver mine globally based on average annual production of 33 Moz AgEq over an 18-year mine life. Our follow up drilling since this study demonstrates there is further growth potential still to be realized within our upcoming Feasibility Study.”

All News