Category: Exploration and Development

Defiance Discovers High-Grade Zones in Historically Unsampled Drill Core

Chris Wright, Chairman & CEO, commented: “Multiple years of technical analysis have outlined and confirmed that resource building targets exist in the hanging-wall and footwall of the main Veta Grande structure. Our team has diligently built a comprehensive geologic model that has led to the intersection of wide intervals and high-grade mineralization.”

Kootenay Silver Completes First Four Drill Holes at Columba High Grade Silver Project and Awaits Assays

Kootenay’s President & CEO, James McDonald states, “We are very pleased with the progress so far. I am encouraged to see the strongly mineralized D-Vein encountered as expected in these holes and significantly wide halos of stockwork mineralization that adds to the potential to increase known mineralization more quickly along this structure. We are awaiting assay results and will report on them when received and compiled.”

Heliostar Drills 63m Grading 10.4 g/t Gold and 14.6m Grading 33.0 g/t Gold at the Ana Paula Project, Mexico

Heliostar CEO, Charles Funk, commented, “Ana Paula continues to outperform our expectations and is growing more quickly than we expected when we acquired the project. The current two holes are 26% and 225% higher than predicted in the resource model and, in total, twelve of the thirteen holes targeting the High Grade Panel delivered intercepts with better grades or widths than the existing resource model.”

Silver Valley Metals Provides Corporate Update

As previously announced May 10, 2023, Silver Valley entered discussions with LitioMX, (the national lithium company of Mexico), with the goal of these discussions to ultimately formalize a partnership agreement to explore and produce lithium in Mexico. Silver Valley maintains its 100% ownership of the Potassium Sulphate component of the dual commodity MexiCan Lithium-Potassium Project.

Golden Tag Commences 7,000 Metre Drilling Campaign at La Parrilla Silver Mine Complex

Greg McKenzie, President and CEO stated, “The Golden Tag team is excited to have drilling now underway at the recently acquired La Parrilla Complex, a silver mine with a long history of production and profitability which hosts significant in-place infrastructure including a 2,000 tpd processing facility. This initial phase of drilling is designed to increase the Inferred Resource base at the Project and is the first step in our goal of restarting production at the La Parrilla Complex.”

All News