Category: Exploration and Development

Prime Intersects 3.74 gpt AuEq Over 5.7m at Z-T in New High-Grade Mineralized Zone 350m Beyond Current Resource Pit While Extending High-Grade Shoots at Depth

Prime Mining Corp. Chief Executive Officer Scott Hicks commented, “Drilling at the Z-T Area has discovered a new high-grade mineralized zone of over 350m, along strike to the southeast of the Tahonitas resource pit and has also extended two separate high-grade plunges in this area by an additional 70 to 80m down-dip. Mineralization here now continues 300m down-dip from the May 2023 resource pits. We are excited to see the potential of this expansion target evolve.”

Bendito Resources Secures Project Financing for Oposura Phase 1 Operations and Announces Commencement of Direct Ore Shipments in a Transaction with Ocean Partners

Mr. John Antwi, President and CEO of Bendito, commented “Bendito is very excited to secure this arrangement with Ocean Partners to develop the Oposura project. Phase 1 production activities could be considered as bulk sampling as it provides additional metallurgical data for the feasibility studies of the larger Oposura project. Besides the compelling economics of direct shipping some of the high-grade ore for smelting, we also have an opportunity to process the medium to low-grade ores, that come along from mining, as concentrates for further smelting.”

Over 6,200 Delegates Attend Annual AME Roundup Conference in Vancouver

“Every January, AME’s Roundup plays an important role in facilitating conversations about the future of our industry, and this year was no different. The passion, expertise and perseverance of our members and attendees was clearly on display over the last four days, as we gained inspiration for exploration projects that will ultimately supply the minerals and metals required for our high-tech, low-carbon future,” stated Keerit Jutla, President & CEO of the Association for Mineral Exploration.

Silver Storm Drills 1,000 g/t Ag.Eq Over 5.25 m

Greg McKenzie, President and CEO, commented: “We are very pleased with the drilling and geologic mapping results at San Nicolas. Prior to placing La Parrilla on care and maintenance First Majestic had commenced mining over 5 established levels and 80 vertical metres at San Nicolas. We have now been able to expand and trace the high-grade mineralization 370 metres down from surface, with continuity. It is a tremendous benefit to have all the infrastructure available to support the potential mining and processing of these expanding zones.”

Orla Mining Provides an Update on Infill Drilling at Camino Rojo Sulphides Deposit with Multiple Highly Positive Drill Intersections

“New drill results at Camino Rojo are revealing more about controls on mineralization and hinting at potential for significant expansion below the current Mineral Resource in the Camino Rojo Extension. This data is crucial for our upcoming underground resource estimation, enhancing our understanding of this important part of our growth pipeline.”

Prime Announces 2024 Outlook for Its High-Grade Los Reyes Gold-Silver Project

Scott Hicks, Executive Vice President commented, “We begin the new year with approximately CAD$32.8 million in cash. In 2024, our aim is to further illustrate the immense potential of the Los Reyes property through an initial, fully funded 40,000 metres drilling campaign targeting resource expansion and proving up several key generative targets.”

All News