Location

TORONTO, ONTARIO, Oct 15, 2014 (Marketwired via COMTEX) — Argonaut Gold Inc. ("Argonaut", "Argonaut Gold" or the "Company") (AR), announced today that the Company produced 32,122 gold equivalent ounces ("GEOs" or "GEO") during the third quarter ("Q3") ended September 30, 2014. This included 22,980 GEOs at its 100% owned El Castillo Mine ("El Castillo") located in Durango, Mexico and 9,142 GEOs at its 100% owned La Colorada Mine ("La Colorada") located near Hermosillo, Mexico. Additionally, the Company reported record GEOs loaded to the pads in Q3, which will be reflected in the fourth quarter ("Q4") production numbers.

-----------------------------------------------------------------------
-----
                                                   3rd Quarter
----------------------------------------------------------------------------
                                                    2014      2013   Change
----------------------------------------------------------------------------
Total Gold Equivalent Ounce Production:
----------------------------------------------------------------------------
GEOs loaded to the pads(1)                        69,777    46,086      +51%
----------------------------------------------------------------------------
GEOs projected recoverable ounces(1,2)            41,296    26,590      +55%
----------------------------------------------------------------------------
GEOs produced(1)                                  32,122    27,893      +15%
----------------------------------------------------------------------------
GEOs sold(1)                                      29,917    32,044       -7%
----------------------------------------------------------------------------
(1) GEOs are based on conversion ratio of 55:1 for silver to gold and is the
referenced ratio throughout this release.
(2) Recoverable ounces - see tables titled Third Quarter 2014 El Castillo
Operating Statistics and Third Quarter 2014 La Colorada Operating
Statistics.


THIRD QUARTER 2014 HIGHLIGHTS:

At both mines, operational improvements resulted in record GEOs being loaded to the pads. These improvements made in the third quarter are expected to result in significantly increased gold and silver production being realized in the fourth quarter, which has been demonstrated in first days of October. Tonnes mined and processed continue to show steady improvement year over year. However, seasonal rains during the third quarter caused dilution of the leaching solutions, thereby reducing the recovered ounces. Due to these seasonal effects, the Company is adjusting full year production guidance to 130,000 to 135,000 GEOs, from previous guidance which was at the lower end of the range of 135,000 to 150,000 GEOs. Management anticipates higher production in the fourth quarter, as the Company begins to recover the record ounces loaded during the third quarter coupled with drier weather.

El Castillo

--  GEO production of 22,980 ounces consisting of 22,807 gold ounces and
    9,541 silver ounces. Production for the third quarter was affected by
    the rainy season which caused dilution of solution grades.
--  A record 44,031 gold ounces loaded on the leach pads, equating to 27,214
    projected recoverable gold ounces. Solution grades have steadily
    increased in October as a result of drier weather, which is expected to
    result in production improvements during Q4.
--  Mining:
    --  7,714,185 total tonnes mined, an 18% improvement year over year.
    --  The gold grade of 0.34 grams per tonne ("g/t"), was a 9% improvement
        over the previous quarter and slightly better than the mine plan.
    --  Strip ratio decreased to 0.9:1 for the quarter, consistent with the
        mine plan expectations.
    --  Oxidized ore mined in the quarter was 89% of the total ore mined.
--  Processing: Operation of the east and west crushing and conveying
    systems continued to improve with approximately 1.5 million tonnes moved
    on both circuits individually.
--  Construction: West side leach pad cell 3b construction was finalized.


La Colorada

--  GEO production of 9,142 ounces, consisting of 8,870 gold ounces and
    14,958 silver ounces.
--  A record 21,195 gold ounces and 250,322 silver ounces were loaded to the
    leach pad, equating to 25,746 GEOs loaded to the pad. This represents a
    35% increase in gold ounces loaded to the pad versus the previous
    quarter.
--  Crushing/Processing:
    --  Another quarterly record was set with 1,067,946 tonnes placed on the
        pad, a 21% improvement over the previous quarter.
    --  During September, a record of over 13,700 tonnes of crushed ore per
        day was loaded to the leach pad, exceeding the anticipated 12,000
        tonnes per day.
    --  During October, the Company has seen a steady improvement in the
        grade of the solution from the pad yielding gold production of more
        than 150 ounces per day since the beginning of the month.
    --  The strip ratio of 4.6:1 was in line with the previous quarter and
        expectations.


Magino

--  New targets for future exploration have been identified on ground
    related to the recently finalized transaction with Richmont Mines Inc.
--  Permitting documentation and studies continue to advance on the project;
    permit applications are expected to be submitted around the end of the
    year.


San Antonio

--  The Company continues to pursue activities to move forward a project
    that is mutually beneficial to all stakeholders by engaging in dialogue
    with the local communities, local and federal agencies, as well as
    reviewing its legal options.


San Agustin

--  Phase II drill program of approximately 13,000 metres to be positioned
    on 200 metre spacing has begun. The area defined for exploration at San
    Agustin follows the trend of mineralization for upwards of two
    kilometres from east to west and is approximately 0.5 kilometres wide
    from north to south.
--  The Company released a National Instrument ("NI") 43-101 Technical
    Report on the current resource on October 3, 2014 and anticipates
    issuing a Preliminary Economic Assessment ("PEA") by year end.
--  Metallurgical test work conducted internally by Argonaut was completed.
    Initial results from external tests completed at Kappes, Cassiday &
    Associates ("KCA") were reported previously in the Press Release dated
    August 22, 2014. Below are the results of the remaining tests. These
    additional tests were conducted at Argonaut's El Castillo mine
    metallurgical testing facilities under the guidance of KCA. In addition,
    there are two duplicate columns reported that were conducted by KCA in
    their facilities in Reno, Nevada.
Summary Table of San Agustin Test Results provided by KCA
----------------------------------------------------------------------------
                 Average Results of
                     Test Work
Crush Size,     Previously Reported  Average Results of
 millimetre       in Press Release   Test Work Reported  Overall Average of
 ("mm"), 100%     Dated August 22,     In This Press     All Argonaut Test
 Passing              2014 (1)            Release             Work (2)
----------------------------------------------------------------------------
                     Gold    Silver
                   ("Au")    ("Ag")        Au        Ag        Au        Ag
----------------------------------------------------------------------------
ROM (3)                                    56%       11%       56%       11%
----------------------------------------------------------------------------
50                     65%       16%       66%       17%       65%       16%
----------------------------------------------------------------------------
12.5                   70%       24%       72%       28%       71%       26%
----------------------------------------------------------------------------
Note (1) - See Argonaut San Agustin Press Release dated August 22, 2014 for
 previously reported test work results.
Note (2) - Overall average is weighted by the number of tests in each
 group.
Note (3) - Run-of-Mine ("ROM")
Detailed Table of San Agustin Test Results provided by KCA
----------------------------------------------------------------------------
             Crush
             Size,
             mm                                         Hydrated
Sample       100%                    Recovery  Leach        Lime     Cyanide
 Description Passing    Head Grade Percentage   Time Consumption Consumption
----------------------------------------------------------------------------
                         Au     Ag
                        g/t    g/t   Au    Ag   Days     kg/t(1)        kg/t
----------------------------------------------------------------------------
SAT 1 -      ROM
 Intrusive            0.445  20.31   68%   13%   105         3.2        0.66
----------------------------------------------------------------------------
SAT 2 -      ROM
 Intrusive            0.236  10.00   44%    2%    98         3.1        0.56
----------------------------------------------------------------------------
SAT 3 -      ROM
 Intrusive            0.452   9.41   58%   15%    98         3.2        0.58
----------------------------------------------------------------------------
SAT 4 -      ROM
 Sediments            0.620   3.90   55%   14%    78         3.0        0.56
----------------------------------------------------------------------------
Average All                          56%   11%               3.1        0.59
----------------------------------------------------------------------------
Note (1) -kilograms per tonne ("kg/t")
----------------------------------------------------------------------------
             Crush
             Size,
             mm                                         Hydrated
Sample       100%                    Recovery  Leach        Lime     Cyanide
 Description Passing    Head Grade Percentage   Time Consumption Consumption
----------------------------------------------------------------------------
                         Au     Ag
                        g/t    g/t   Au    Ag   Days        kg/t        kg/t
----------------------------------------------------------------------------
SAT 1 -
 Intrusive   50       0.394  22.20   84%   20%   105         3.8        1.54
----------------------------------------------------------------------------
SAT 2 -
 Intrusive   50       0.284   8.85   63%    5%    98         3.6        0.87
----------------------------------------------------------------------------
SAT 3 -
 Intrusive   50       0.410   9.07   45%   13%    90         3.7        1.23
----------------------------------------------------------------------------
SAT 4 -
 Sediments   50       0.644   4.41   72%   28%    72         3.1        1.19
----------------------------------------------------------------------------
Average All                          66%   17%               3.6        1.21
----------------------------------------------------------------------------
----------------------------------------------------------------------------
             Crush
             Size,
             mm                                         Hydrated
Sample       100%                    Recovery  Leach        Lime     Cyanide
 Description Passing    Head Grade Percentage   Time Consumption Consumption
----------------------------------------------------------------------------
                         Au     Ag
                        g/t    g/t   Au    Ag   Days        kg/t        kg/t
----------------------------------------------------------------------------
SAT 1 -
 Intrusive   12.5     0.422  25.14   82%   28%   113         4.0        1.49
----------------------------------------------------------------------------
SAT 1 -
 Intrusive
 (KCA
 Duplicate)  12.5     0.477  18.46   83%   35%    69         3.0        0.70
----------------------------------------------------------------------------
SAT 2 -
 Intrusive   12.5     0.247   9.99   61%    8%   106         3.9        1.05
----------------------------------------------------------------------------
SAT 3 -
 Intrusive   12.5     0.691  11.29   76%   28%    98         4.0        1.32
----------------------------------------------------------------------------
SAT 3 -
 Intrusive
 (KCA
 Duplicate)  12.5     0.473   5.80   61%   34%    69         3.1        1.02
----------------------------------------------------------------------------
SAT 4 -
 Sediments   12.5     0.645   3.90   71%   36%    80         3.3        1.27
----------------------------------------------------------------------------
Average All                          72%   28%               3.6        1.14
----------------------------------------------------------------------------


CEO Commentary

Pete Dougherty, President and CEO for Argonaut Gold commented, "At both mines, we continue to demonstrate improvements in all aspects of our operations. In spite of challenges related to seasonal rains, these operational improvements have set new records of GEOs loaded to the pads and laid the groundwork for robust fourth quarter production results. While operational improvements have been noteworthy, we expect that full year production will be in the range of 130,000 to 135,000 GEOs.

"At El Castillo, we completed the construction of west cell 3b pad and are hitting targets for mining and crushing throughputs with a new record being set in September for the west overland crusher/conveyor. At La Colorada, we continue to make improvements with new record GEOs being loaded to the pad. During September, crushing throughput exceeded expectations at La Colorada averaging over 13,700 tonnes per day.

"The fourth quarter production is expected to significantly increase at both locations as we begin to recover the ounces loaded during the third quarter.

"The San Agustin project has not disappointed with the release of our recent NI 43-101 indicated resource results of nearly 1.3 million gold equivalent ounces (82.2 million tonnes of material at a grade of 0.32 g/t gold and 10.7 g/t silver with gold equivalent ounces calculated at a ratio of 65:1 silver to gold ounces) and we are quite pleased. We have initiated additional drilling to test the limits of the deposit and started to work on a PEA for the project, which we anticipate will be complete by year end.

"We continue to work toward permitting at both San Antonio and Magino. We have begun further test work to understand the potential of heap leaching at the Magino project as well as advancing the permitting efforts. At the San Antonio project, we continue to make efforts to advance this project, as we believe it has near term potential to unlock significant value to all stakeholders of this project."

THIRD QUARTER 2014 EL CASTILLO OPERATING STATISTICS
                                   3 Months Ended            9 Months Ended
                                     September 30              September 30
                             2014   2013 % Change     2014    2013 % Change
Mining
  Tonnes ore (000s)         4,059  3,406      +19%  11,492   9,857      +17%
  Tonnes waste (000s)       3,655  3,136      +17%  12,343   9,567      +29%
  Tonnes mined (000s)       7,714  6,542      +18%  23,835  19,424      +23%
  Tonnes per day (000s)        84     71      +18%      87      71      +23%
  Waste/ore ratio            0.90   0.92       -2%    1.07    0.97      +10%
Heap Leach Pad
  Tonnes ore direct to
   leach pad (000s)         1,063  1,867      -43%   2,569   5,307      -52%
  Tonnes crushed (000s)     1,499  1,318      +14%   4,612   4,314       +7%
  Tonnes overland conveyor
   (000s)                   1,497    221     +577%   4,311     221   +1,851%
Total Tonnes Placed         4,059  3,406      +19%  11,492   9,842      +17%
Production
  Gold grade (g/t)(1)        0.34   0.36       -6%    0.33    0.36       -8%
  Gold loaded to leach pad
   (oz)(2)                 44,031 39,120      +13% 121,307 115,312       +5%
  Projected recoverable
   gold ounces (oz)(3)     27,214 22,829      +19%  70,916  67,766       +5%
  Gold produced (oz)       22,807 22,756       +0%  64,824  73,957      -12%
  Gold sold (oz)           20,527 25,840      -21%  63,725  72,054      -12%
(1) "g/t" refers to grams per tonne
(2) "oz" refers to troy ounce
(3) Expected recovery rates: ROM oxide 50%, crushed oxide 70%, ROM
transition 40%, crushed transition 60%, crushed sulphides argillic 30%,
crushed sulphides silicic 17%.


Richard Rhoades, Chief Operating Officer for the Company, commented, "We are pleased to have another quarter of continued improvement at El Castillo. Ore tonnes mined increased, along with tonnes and ounces loaded to the pad, despite the effects of the summer rains. The availabilities of the mining and crushing equipment increased and the operation is poised to deliver a strong finish to the year. With these improvements, along with the completion of west side heap leach pad 3b, we are in a position to increase our production run rates and deliver on the guidance at this project of 90,000 to 100,000 ounces of production this year."

THIRD QUARTER 2014 LA COLORADA OPERATING STATISTICS
                                   3 Months Ended            9 Months Ended
                                     September 30              September 30
                             2014   2013 % Change     2014    2013 % Change
Mining
  Tonnes ore (000s)           757    415      +82%   2,017   1,313      +54%
  Tonnes waste (000s)       3,486  2,885      +21%  10,674  10,485       +2%
  Total tonnes (000s)       4,243  3,300      +29%  12,691  11,798       +8%
  Waste/ore ratio            4.61   6.96      -34%    5.29    7.99      -34%
  Tonnes rehandled (000s)     301    118     +155%     616     118     +422%
Heap Leach Pad
  Tonnes ore direct to
   leach pad (000s)         1,068    550      +94%   2,583   1,435      +80%
Production
  Gold grade mined
   (g/t)(1)                  0.70   0.35     +100%    0.66    0.30     +120%
  Gold loaded to leach pad
   (oz)(2)                 21,195  5,571     +280%  47,658  13,509     +253%
  Projected recoverable
   GEOs loaded (oz)(3)     14,082  3,761     +274%  31,555   9,173     +244%
  Gold produced (oz)        8,870  4,234     +109%  24,853  15,527      +60%
  Silver produced (oz)     14,958 31,717      -53% 111,761 121,914       -8%
  GEOs produced (oz)        9,142  4,811      +90%  26,885  17,744      +52%
  Gold sold (oz)            8,883  4,952      +79%  25,146  15,935      +58%
  Silver sold (oz)         18,313 50,881      -64% 123,607 132,951       -7%
  GEOs sold                 9,217  5,878      +57%  27,394  18,353      +49%
(1) "g/t" refers to grams per tonne
(2) "oz" refers to troy ounce
(3) Expected recovery rates: Gold 60% and Silver 30%


Richard Rhoades commented, "Following the completion of the expansion of the crushing circuit at La Colorada, we set record highs with September crushed production over 13,700 tonnes per day. The grade processed also improved slightly over last quarter and is slightly above the resource grade. All of this contributed to a significant increase in ounces loaded to the pad. We expect strong fourth quarter production results."

Argonaut Gold Q3 Financial Results Conference Call and Webcast:

The Q3 financial results conference call and webcast is scheduled to take place on November 6, 2014 at 8:30 am EST.

Q3 Conference Call Information
     Toll Free (North America):     1-877-223-4471
     International:                 1-647-788-4922
     Conference ID:                 87196199
     Webcast:                       http://www.argonautgold.com/
Q3 Conference Call Replay:
     Toll Free Replay Call (North America):  1-416-621-4642
     International Replay Call:              1-800-585-8367


The conference call replay will be available from 11:30 am EST on November 6, 2014 until November 20, 2014.

Technical Information and Mineral Properties Reports

The technical information contained in this document has been prepared under the supervision of, and has been reviewed and approved by, Mr. Thomas H. Burkhart, Argonaut's Vice President of Exploration, and a qualified person as defined by NI 43-101. For further information on the Company's properties please see the reports as listed below on the Company's website or on www.sedar.com:

-----------------------------------------------------------------------
-----
El Castillo Mine NI 43-101 Technical Report on Resources and Reserves,
                 Argonaut Gold Inc., El Castillo Mine, Durango State, Mexico
                 dated February 24, 2011.
----------------------------------------------------------------------------
La Colorada Mine NI 43-101 Preliminary Economic Assessment La Colorada
                 Project, Sonora, Mexico dated December 30, 2011.
----------------------------------------------------------------------------
Magino Gold      NI 43-101 Technical Report and Mineral Resource Estimate on
Project          the Magino Gold Project, Wawa, Ontario, Canada dated
                 January 30, 2014.
----------------------------------------------------------------------------
San Agustin      NI 43-101 Technical Report and Mineral Resource Estimate on
Project          the San Agustin Gold Project, Durango, Mexico dated October
                 3, 2014.
----------------------------------------------------------------------------
San Antonio Gold NI 43-101 Technical Report and Mineral Resource Estimate on
Project          the San Antonio Gold Project, Baja California Sur, Mexico
                 dated October 10, 2012.
----------------------------------------------------------------------------


Qualified Person Comments/Quality Control Procedures

Mineral resources do not constitute mineral reserves and do not have demonstrated economic viability.

About Argonaut Gold

Argonaut Gold is a Canadian gold company engaged in exploration, mine development and production activities. Its primary assets are the production stage El Castillo mine in Durango, Mexico, and the La Colorada mine in Sonora, Mexico. Advanced exploration stage projects include the San Antonio project in Baja California Sur, Mexico, the San Agustin project in Durango, Mexico and the Magino project in Ontario, Canada. The recently acquired San Agustin project is the primary exploration target for Argonaut in 2014. The Company also has several exploration stage projects, all of which are located in North America.

Creating Value Beyond Gold

Cautionary Note Regarding Forward-looking Statements

This preliminary announcement of production results will be followed with a report of financial results in connection with the publication of quarterly financial information. This press release contains certain "forward-looking statements" and "forward-looking information" under applicable Canadian securities laws concerning the proposed transaction and the business, operations and financial performance and condition of Argonaut Gold Inc. ("Argonaut" or "Argonaut Gold"). Forward-looking statements and forward-looking information include, but are not limited to, statements with respect to estimated production and mine life of the various mineral projects of Argonaut; the benefits of the development potential of the properties of Argonaut; the future price of gold, copper, and silver; the estimation of mineral reserves and resources; the realization of mineral reserve estimates; the timing and amount of estimated future production; economics of production; synergies and financial impact of completed acquisitions; success of exploration activities; and currency exchange rate fluctuations. Except for statements of historical fact relating to Argonaut, certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate," "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements are based on the opinions and estimates of management at the date the statements are made, and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. Many of these assumptions are based on factors and events that are not within the control of Argonaut and there is no assurance they will prove to be correct.

Factors that could cause actual results to vary materially from results anticipated by such forward-looking statements include variations in ore grade or recovery rates, failure of plant, equipment or processes to operate as anticipated, changes in market conditions, risks relating to international operations, fluctuating metal prices and currency exchange rates, changes in project parametres, the possibility of project cost overruns or unanticipated costs and expenses, labour disputes and other risks of the mining industry.

These factors are discussed in greater detail in Argonaut's most recent Annual Information Form and in the most recent Management Discussion and Analysis filed on SEDAR, which also provide additional general assumptions in connection with these statements. Argonaut cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Argonaut believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. These statements speak only as of the date of this press release.

Although Argonaut has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Argonaut undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward- looking statements. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking statements to the extent they involve estimates of the mineralization that will be encountered if the property is developed. Comparative market information is as of a date prior to the date of this document.

Contacts:
Argonaut Gold Inc.
Nichole Cowles
Investor Relations
(775) 284-4422 x 101
[email protected]
www.argonautgold.com

SOURCE: Argonaut Gold Inc.

SHARE THIS POST?

Facebook
Twitter
LinkedIn
WhatsApp
Telegram
Email