Soltoro Ltd. (TSX VENTURE:SOL) has filed its NI 43-101 resource estimate for its 100% owned El Rayo silver project on SEDAR and made it available on the Company’s website. The report was prepared by Roscoe Postle Associates Inc. (“RPA”). The El Rayo property is located approximately 110 km west-northwest of Guadalajara, Jalisco State, Mexico. The NI 43-101 compliant Mineral Resources were estimated by RPA and include an updated estimate for the Las Bolas and Highway Zone structures and an initial estimate for the La Soledad structure.
The Mineral Resources are estimated by RPA by constructing block models and applying a preliminary open pit on each of the deposits. The estimates of in-pit resources are shown in the tables below:
The Company has also been investigating the gold potential at the north end of the El Rayo structure. Previous drilling had identified a gold zone one kilometre in strike length. At a pit discard cut-off grade of 0.35 g/t Au, the resource estimate for the northernmost 250 metres of the gold structure is reported by RPA as follows:
A copy of the full resource estimation report is available on the SEDAR website and by following this link on Soltoro’s website: http://www.soltoro.com/
The Mineral Resources were estimated by Hrayr Agnerian, M.Sc. (Applied), P.Geo., Associate Principal Consulting Geologist with RPA. Mr Agnerian is the Qualified Person for the purposes of National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators, and has verified the data disclosed in this release.