Highlights:
El Peñón,
- New vein has been discovered approximately 300 metres east of Fortuna – Fortuna Este.
- New zone of significant mineralization has been identified south of the main Dorada vein and to the west between Dorada and
Providencia . - Drilling has delineated a new high grade deposit at the Elizabeth vein located 400 metres east of
Victoria within Pampa Augusta Victoria.
Significance: New discoveries are being advanced through exploration and accelerated through development as they represent an opportunity to significantly extend minelife and further enhance production at, or above, a 440,000 ounce sustainable production level.
Chapada,
- Mineralization has been identified at Chapada along a strike length of almost 16 kilometres with the discovery of significant gold and copper mineralization encountered approximately 2,500 metres south of Corpo Sul.
- Alteration and mineralization at Corpo Sul are similar to Chapada but may be related to a completely distinct porphyry cluster.
Significance: Potential to enhance throughput through the blending of these higher grade ores and possibly allow further development in size and scale to potentially result in an entirely new mine.
Mercedes,
- New discovery at
Barrancas where drilling has intersected mineralization approximately 600 metres north of Lagunas Norte. - Infill drilling at Lupita is confirming the width and grades of mineralization and is expected to continue growth of the measured and indicated mineral resources.
Significance: Expected to enhance mineral resource base, extend minelife and maintain higher throughput and sustainable production levels.
Pilar,
- Maria Lazarus, a newly identified target, located 10 kilometres west of Jordino with results similar to Jordino in both grade and width.
- Drilling two kilometres south east of Jordino under post mineral cover intersected coarse visible gold and assayed 0.43 metres of 66.4 g/t gold indicating that the system is open in that direction.
Significance: Discoveries continue to confirm a cluster of mineralized zones for contribution to production at Pilar although the area has the potential to become a multi-mine complex.
The Company’s exploration budget for 2012 is approximately
El Peñón,
The El Peñón high grade underground gold silver mine is located in northern
During the first five months of 2012 a total of 34,383 metres of drilling have been completed. The drilling has resulted in the discovery of a new mineralized vein structure, Fortuna Este and the advancement of two new targets that will provide mineral reserve and mineral resource growth for 2012.
Fortuna Este
Exploration drilling completed in the second half of 2011 discovered a massive quartz vein structure 300 metres east of the Fortuna deposit. The discovery hole, SFE0001 returned 3.12 metres at 2.79 g/t gold equivalent (1.30 g/t gold and 74.45 g/t silver.) Since the discovery, seven widely spaced surface reverse circulation and diamond drill holes and three underground diamond drill holes have been completed along a strike length of 800 metres.
To view the Fortuna Este Map, please visit the following link:
.
Fortuna Este | ||||
Hole No. | From (metres) | Width (metres) | Gold (g/t) | Silver (g/t) |
SFE0001 | 156.00 | 3.12 | 1.30 | 74 |
SFE0002 | 169.00 | 2.16 | 1.83 | 174 |
SFE0008 | 204.00 | 1.53 | 1.10 | 13 |
SFE0009C | 204.00 | 4.06 | 3.84 | 273 |
SFE0012 | 80.00 | 3.14 | 1.26 | 8 |
267.00 | 2.21 | 0.40 | 5 | |
SFE0013 | 142.00 | 1.45 | 0.00 | 0 |
SFE0015 | 230.00 | 1.43 | 13.00 | 480 |
UET0022 | 207.28 | 0.50 | 37.50 | 5114 |
UET0023 | 328.20 | 0.50 | 51.76 | 1509 |
UET0024 | 332.30 | 0.54 | 6.80 | 6 |
*All widths contained in this release refer to true widths. |
The best grades and widths of mineralization have been intersected in the northern part of Fortuna Este where SFE0009C returned 4.06 metres @ 9.3 g/t gold equivalent (3.84 g/t gold and 273 g/t silver.) UET0023 located 220 metres further north, returned 0.50 metres @ 81.94 g/t gold equivalent (51.76 g/t gold and 1,509 g/t silver) and UET0024 intersected 0.54 metres at 6.9 g/t gold equivalent (6.8 g/t gold and 6.3 g/t silver).
At the southern end of Fortuna Este, approximately 400 metres from SFE0009C, SFE0015 intersected 1.43 metres @ 22.6 g/t gold equivalent (13.0 g/t gold and 480 g/t silver).
In addition to the new Fortuna Este vein, UET0022 intersected 0.50 metres at 139.8 g/t gold equivalent (37.5 g/t gold and 5,114 g/t silver) from a zone of sulfide bearing hydrothermal breccia located approximately 100 metres east of Fortuna. This may be a splay of Fortuna vein or the discovery of a new subparallel vein system.
The presence of these high grades, multiple structures and the continuity of a mineralized structure bode well for the upside of Fortuna Este. During the remainder of 2012, drilling will focus on expanding the high-grade areas in both the north and south as well as delineating the new structure identified in UET0022.
Dorada South
Two new mineralized structures, Dorada West 1 and Dorada West 2 have been identified along the southern projection of Dorada. The structures, which are separated by 20 to 30 metres of barren wall rock have been traced along 700 metres of strike length and remain open along strike to the south. The best intersection is in hole, SNX0238 which returned 2.98 metres @ 57.46 g/t gold equivalent (24.2 g/t gold and 1,663 g/t silver.) The average widths and grades of mineralization with the current drill results are 2.26 metres @ 13.18 g/t gold equivalent (5.07 g/t gold and 348 g/t silver) for Dorada West 1 and 1.06 metres @ 13.61 gold g/t equivalent (9.21 g/t gold and 220 g/t silver) for Dorada West 2.
To view the Dorada South Map, please visit the following link:
.
Dorada West 1 | ||||
Hole No. | From (metres) | Width (metres) | Gold (g/t) | Silver (g/t) |
SNX0235 | 364.00 | 6.16 | 3.87 | 320 |
SNX0238 | 392.00 | 2.98 | 24.20 | 1663 |
SNX0239 | 399.00 | 2.38 | 0.02 | 2 |
UID0011 | 107.18 | 0.77 | 2.08 | 116 |
UID0012 | 98.00 | 1.01 | 14.05 | 6 |
UID0013 | 105.00 | 0.40 | 1.27 | 42 |
UID0014 | 124.52 | 0.95 | 2.38 | 134 |
UID0015 | 125.29 | 2.53 | 4.37 | 371 |
UID0016 | 114.00 | 1.00 | 2.62 | 241 |
UID0017 | 154.30 | 0.62 | 8.03 | 674 |
UED0001 | 102.43 | 2.76 | 3.98 | 294 |
UED0002 | 168.40 | 0.54 | 0.53 | 49 |
UED0003 | 124.07 | 4.00 | 1.80 | 146 |
UED0004 | 99.00 | 1.05 | 2.60 | 150 |
PX589 | 388.00 | 4.13 | 0.70 | 44 |
PX594 | 357.00 | 1.39 | 1.73 | 21 |
PX598 | 366.00 | 2.42 | 0.50 | 62 |
PX574 | 372.00 | 3.98 | 4.08 | 301 |
PX596 | 319.00 | 3.88 | 10.44 | 790 |
PX600 | 402.00 | 1.80 | 0.81 | 32 |
Dorada West 2 | ||||
Hole No. | From (metres) | Width (metres) | Gold (g/t) | Silver (g/t) |
SNX0235 | 379.00 | 1.82 | 3.71 | 275 |
SNX0236 | 316.00 | 2.84 | 0.01 | 0 |
SNX0237 | 367.00 | 1.85 | 0.66 | 47 |
SNX0239 | 441.00 | 0.60 | 1.34 | 104 |
UID0011 | 67.53 | 1.32 | 14.99 | 807 |
UID0012 | 71.45 | 0.75 | 3.16 | 49 |
UID0013 | 77.50 | 0.61 | 146.29 | 169 |
UID0014 | 84.28 | 1.80 | 5.13 | 522 |
UID0015 | 91.50 | 0.38 | 3.48 | 287 |
UID0016 | 93.05 | 0.27 | 4.71 | 358 |
UID0017 | 126.50 | 0.49 | 1.19 | 91 |
UED0001 | 77.00 | 0.90 | 2.79 | 182 |
UED0003 | 90.00 | 0.77 | 1.71 | 36 |
UED0004 | 96.10 | 0.50 | 1.68 | 89 |
Mineralization consists of oxidized hydrothermal breccias and quartz veins with abundant hematite and manganese oxides and is best developed near a sub horizontal contact between rhyolite tuffs and underlying rhyolite flows and intrusive rocks. The mineralization has been traced along a dip length of approximately 150 metres and remains open down dip.
Pampa Augusta Victoria –
Past drilling at Pampa Augusta Victoria had identified several discontinuous vein zones in the hanging wall of the main
Results are shown in the figures and table below:
Elizabeth Vein | ||||
Hole No. | From (metres) | Width (metres) | Gold (g/t) | Silver (g/t) |
SUI0133C | 205.75 | 0.12 | 0.20 | 98 |
SUI0134C | 205.35 | 0.10 | 1.10 | 281 |
SUI0135C | 282.50 | 0.54 | 13.87 | 3111 |
SUI0136C | 260.55 | 0.41 | 2.23 | 167 |
SUI0137C | 182.82 | 0.19 | 47.80 | 5695 |
SUI0138C | 156.05 | 0.22 | 0.22 | 1 |
SUI0139C | 179.15 | 0.02 | 0.00 | 0 |
SUI0141C | 231.00 | 0.35 | 0.15 | 52 |
SUI0142C | 274.00 | 0.34 | 0.98 | 152 |
SUI0143C | 244.30 | 0.19 | 2.83 | 410 |
SUI0144C | 258.40 | 0.40 | 34.53 | 2572 |
SUI0146C | 257.35 | 0.61 | 0.01 | 0 |
SUI0147C | 301.00 | 0.11 | 0.04 | 2 |
SUI0155C | 188.81 | 0.16 | 3.72 | 1262 |
SUI0156C | 193.41 | 0.09 | 0.16 | 2 |
SUI0157C | 236.45 | 0.42 | 7.55 | 2154 |
SUI0158C | 232.85 | 0.23 | 0.27 | 20 |
SUI0159C | 277.45 | 0.20 | 0.37 | 18 |
SUI0160C | 253.28 | 1.15 | 10.71 | 2677 |
SUI0161C | 276.95 | 0.21 | 16.10 | 1646 |
SUI0162C | 308.02 | 0.50 | 6.72 | 906 |
SUI0163C | 261.20 | 0.19 | 0.11 | 3 |
SUI0164C | 259.60 | 0.21 | 0.32 | 90 |
SUI0165C | 255.45 | 0.36 | 9.55 | 1265 |
SUI0166C | 287.40 | 0.43 | 8.59 | 196 |
SUI0167C | 272.90 | 0.44 | 1.71 | 281 |
SUI0168C | 264.00 | 0.25 | 1.94 | 729 |
SUI0169C | 327.96 | 0.27 | 1.22 | 856 |
SUI0170C | 197.58 | 0.30 | 0.04 | 1 |
SUI0176C | 166.85 | 0.40 | 2.77 | 597 |
SUI0177C | 151.65 | 0.61 | 19.10 | 1014 |
SUI0178C | 178.45 | 0.26 | 0.02 | 2 |
A total of 32 holes have been completed to date at Elizabeth and have outlined mineralization along a strike length of 300 metres and a dip length of 150 metres and the mineralization remains open along strike and locally down dip. As with
Additional drilling in 2012 will focus on extending the mineralization at Elizabeth as well as the other sub parallel structures east of
Exploration drilling will continue throughout 2012 to further extend mineralization at
Pampa Augusta Victoria is being fast tracked which will contribute to production and, along with the new discoveries, will give us the flexibility to consider an increase in annual production above the newly established sustainable level of 440,000 GEO.
Chapada,
The Chapada open pit gold-copper mine is located northwest of Brasília in Goiás State. The
Early results from current diamond drilling completed south of the Corpo Sul extension have returned very encouraging gold and copper values from sulphide mineralization. Hole CS-70 is the southernmost hole completed to date and intersected wide zones of alteration and mineralization and 154 metres of 0.17 g/t gold and 0.32% copper including a higher grade core of 106 metres of 0.22 g/t gold and 0.41% copper. This intersection extends Corpo Sul for more than 2.5 kilometres along strike to the southwest. Mineralization remains open in that direction and along dip in both directions. Additional drilling on sections spaced between 200 to 400 metres apart confirm similar grades to that in CS-70 as outlined in the tables and figure below from south to north.
To view the Corpo Sul Map, please visit the following link:
.
Corpo Sul | |||||
Section | Hole No. | From (metres) | Width (metres) | Gold (g/t) | Copper (%) |
A | CS-70 | 166 | 154 | 0.17 | 0.32 |
incl. | 182 | 106 | 0.22 | 0.41 | |
CS-83 | pending | ||||
B | CS-66 | 149 | 86.4 | 0.18 | 0.34 |
incl. | 158 | 29 | 0.23 | 0.4 | |
CS-85 | pending | ||||
CS-78 | pending | ||||
C | CS-59 | 237 | 58 | 0.1 | 0.28 |
CS-64 | 106 | 124 | 0.15 | 0.26 | |
incl. | 149 | 46 | 0.24 | 0.41 | |
CS-67 | 176 | 45 | 0.26 | 0.27 | |
incl. | 178 | 23 | 0.36 | 0.35 | |
D | CS-55 | 94 | 179 | 0.13 | 0.25 |
incl. | 187 | 57.8 | 0.2 | 0.41 | |
CS-61 | 132.9 | 91.1 | 0.4 | 0.38 | |
incl. | 134 | 72 | 0.49 | 0.44 | |
E | CS-47 | 109 | 77 | NSV | 0.29 |
incl. | 114 | 6 | 0.2 | 0.48 | |
incl. | 136 | 25 | 0.13 | 0.4 | |
CS-51 | 48.8 | 168.2 | 0.13 | 0.25 | |
incl. | 127 | 43 | 0.23 | 0.39 | |
incl. | 199 | 18 | 0.13 | 0.31 | |
F | CS-46 | 24.1 | 129.1 | 0.14 | 0.27 |
incl. | 56 | 13 | 0.24 | 0.48 | |
CS-43 | 119 | 124 | NSV | 0.16 | |
G | CS-34 | 43.1 | 210.9 | 0.13 | 0.2 |
incl. | 74 | 31.9 | 0.22 | 0.35 | |
CS-37 | 80 | 69.2 | 0.37 | 0.28 | |
incl. | 100 | 35 | 0.55 | 0.37 | |
H | CS-35 | 105 | 127 | 0.14 | 0.25 |
incl. | 106 | 31 | 0.21 | 0.4 | |
CS-36 | 13.3 | 134.3 | 0.4 | 0.41 | |
incl. | 45 | 81.4 | 0.56 | 0.5 | |
CS-41 | 7.4 | 119.6 | 0.24 | 0.2 | |
incl. | 21 | 41 | 0.4 | 0.3 | |
Note: 0.1 g/t gold cutoff, 0.1% copper cutoff. Including results 0.3g/t Au or 0.3% Cu cutoff “incl.” |
The results from Corpo Sul confirm similar metallurgy to the Chapada main pit ores. Based on this and the associated low strip ratio of the existing resource the Company is provided with the flexibility to at least blend ore between the main pit and Corpo Sul to increase production, particularly copper production because of the higher copper grade, although it may represent the opportunity for an entirely new mine.
Drilling completed along strike of the Chapada southwest extension defined in 2011 has returned mixed results with narrow low grade values in CS-45 and CS-48 but both widths and grades improve to the northeast towards the Chapada pit.
Chapada Southwest | |||||
Section | Hole No. | From (metres) | Width (metres) | Gold (g/t) | Copper (%) |
I | CS-32 | 95 | 50 | 0.25 | 0.22 |
CS-38 | 38.21 | 39.72 | NSV | 0.15 | |
J | CS-42 | 92 | 83.16 | 0.14 | 0.23 |
CS-44 | 49 | 65.26 | 0.14 | 0.25 | |
CS-49 | 97 | 65 | 0.13 | 0.26 | |
Note: 0.1 g/t gold cutoff, 0.1% Cu cutoff. |
The drilling at Corpo Sul has identified gold and copper mineralization along a minimum strike length of 4.5 kilometres, to a depth of almost 300 metres and mineralization remains open along strike and down dip. With the discovery of Suruca in late 2009, Corpo Sul in 2011 and the continued positive results at Corpo Sul this year, economic copper and gold mineralization has now been identified along a strike length of almost 16 kilometres including the main Chapada deposit.
Corpo Sul will provide the opportunity to further evaluate whether it will be more than just a higher grade ore contribution to an ore blend, or as it begins to show sufficient size and continuity to either represent a larger portion of ore contribution or an entirely new mine adjacent to Chapada.
During the remainder of 2012, diamond drilling will continue to focus on the expansion and delineation of mineralization at the Corpo Sul extension and on confirming grade continuity of the Corpo Sul mineral resource through infill drilling.
Mercedes,
Mercedes is a gold and silver project located in
Annual production from the mine is estimated to be up to 120,000 gold equivalent ounces in 2012, growing to 140,000 gold equivalent ounces in 2014. Mercedes is a gold-silver vein/stockwork system with mineralization contained in four areas: Mercedes,
To view the
.
Barrancas Vein- Marianas Zone extension
A total of 12 holes have been completed as part of a widely-spaced drilling program that has tested nearly 1,000 metres of strike length to the north west of the Lagunas Norte ore body on the
Ore grade values have been intersected in six holes located nearly 600 metres north west of Lagunas Norte and are highlighted by M12-639D which intersected two vein zones with 3.04 metres of 12.69 g/t gold and 11.5 g/t silver and an additional 1.24 metres of 74.7 g/t gold and 4.0 g/t silver. Additional drilling completed in 2012 will be focused on establishing the continuity and extensions of this newly discovered “Marianas” zone.
Results from recent drilling are highlighted in the table and figure below:
Barrancas Vein – Marianas Zone | ||||||
Hole No. | From (metres) | To (metres) | Interval (metres) | Gold (g/t) | Silver (g/t) | |
M12-637D | 239.27 | 240.79 | 1.52 | 4.69 | 27.0 | |
M12-638D | 323.75 | 325.55 | 1.80 | 4.35 | 13.3 | |
M12-638D | and | 335.28 | 339.85 | 4.57 | 3.12 | 8.2 |
M12-639D | 454.77 | 457.81 | 3.04 | 12.69 | 11.5 | |
M12-639D | and | 468.48 | 470.01 | 1.53 | 3.57 | 8.0 |
M12-639D | and | 476.38 | 477.62 | 1.24 | 74.70 | 4.0 |
M12-640D | 334.67 | 335.99 | 1.32 | 2.53 | 4.0 | |
M12-640D | and | 397.60 | 401.73 | 4.13 | 2.68 | 15.6 |
M12-640D | and | 411.32 | 412.92 | 1.61 | 14.50 | 17.0 |
M12-640D | and | 480.20 | 481.86 | 1.66 | 3.32 | 23.0 |
M12-641D | 448.97 | 450.49 | 1.52 | 3.94 | 6.0 | |
M12-643D | 401.73 | 402.28 | 0.55 | 4.21 | 6.0 | |
M12-644D | 445.40 | 448.37 | 2.97 | 11.33 | 15.7 | |
Note: 2.0 g/t gold equivalent cutoff |
This new discovery at Marianas is currently not reflected in Mercedes’ mineral reserves and mineral resources and it is expected that continued exploration success will contribute to mineral resources growth in 2012.
Lupita
Thirty metre in-fill drilling at Lupita continues to demonstrate that the quartz-carbonate vein/stockwork zone at the lower andesite/upper tuff contact is very continuous. Vein width varies from 0.5 to nearly 15.0 metres although the amount of greenish ore stage quartz varies greatly from hole to hole. Forty-one holes have been completed to date and assays returned from the first 37 holes indicate that most holes within the 2011 inferred grade shell contain at least narrow intervals with grades over 2.0 g/t gold equivalent.
Results are shown in the figure and table below:
Mercedes Drill Results – Lupita | |||||||
Hole No. | From (metres) | To (metres) | Interval (metres) | Gold (g/t) | Silver (g/t) | Gold Equivalent (AuEq)(g/t) (150:1) | |
L12-157D | 72.54 | 79.25 | 6.71 | 4.03 | 23.2 | 4.18 | |
L12-162D | 205.64 | 210.88 | 5.24 | 2.45 | 48.3 | 3.01 | |
L12-164D | 226.77 | 228.30 | 1.53 | 11.35 | 8.0 | 11.49 | |
L12-165D | 252.07 | 253.51 | 1.44 | 3.72 | 30.0 | 3.92 | |
L12-168D | 194.46 | 197.51 | 3.05 | 3.83 | 14.5 | 3.93 | |
L12-169D | 212.75 | 213.06 | 0.31 | 2.44 | 8.0 | 2.49 | |
L12-169D | and | 216.71 | 217.32 | 0.61 | 1.97 | 12.0 | 1.97 |
L12-170D | 284.38 | 286.37 | 1.99 | 5.02 | 22.4 | 5.03 | |
L12-171D | 126.19 | 127.41 | 1.22 | 2.21 | 33.5 | 2.43 | |
L12-173D | 144.07 | 145.39 | 1.32 | 5.37 | 82.0 | 5.91 | |
L12-173D | and | 146.81 | 147.52 | 0.71 | 2.36 | 34.0 | 2.58 |
L12-174D | 178.64 | 182.58 | 3.94 | 4.65 | 58.0 | 5.03 | |
L12-175D | 178.17 | 182.11 | 3.94 | 4.25 | 40.3 | 4.54 | |
L12-176D | 201.17 | 203.00 | 1.83 | 5.28 | 50.9 | 5.62 | |
L12-176D | and | 219.46 | 220.99 | 1.53 | 4.93 | 30.0 | 5.13 |
L12-178D | 47.85 | 48.46 | 0.61 | 3.48 | 5.0 | 3.51 | |
L12-179D | 162.76 | 166.15 | 3.39 | 6.88 | 33.0 | 7.10 | |
L12-182D | 31.39 | 32.00 | 0.61 | 101.50 | 52.0 | 101.85 | |
L12-183D | 177.70 | 179.22 | 1.52 | 3.89 | 18.5 | 4.02 | |
L12-184D | 175.50 | 177.39 | 1.89 | 2.96 | 33.8 | 3.19 | |
L12-185D | 197.07 | 198.12 | 1.05 | 3.11 | 7.0 | 3.15 | |
L12-186D | 197.21 | 199.64 | 2.43 | 9.81 | 74.3 | 10.31 | |
L12-187D | 183.18 | 183.79 | 0.61 | 2.95 | 13.0 | 3.03 | |
L12-187D | and | 184.21 | 186.54 | 2.33 | 2.74 | 18.8 | 2.87 |
L12-189D | 281.03 | 283.40 | 2.43 | 2.97 | 40.3 | 3.24 | |
L12-190D | 231.34 | 231.70 | 0.36 | 2.01 | 20.0 | 2.14 | |
L12-190D | and | 233.05 | 234.65 | 1.60 | 3.11 | 27.5 | 3.29 |
L12-191D | 277.95 | 280.72 | 2.77 | 5.79 | 77.8 | 6.31 | |
L12-192D | 202.08 | 203.91 | 1.83 | 5.73 | 70.3 | 6.19 | |
L12-194D | 182.58 | 184.40 | 1.82 | 6.19 | 53.1 | 6.55 | |
Note: Cutoff 2.0 g/t gold equivalent |
The drill program currently being completed at Lupita will increase the confidence in mineral resources from inferred to indicated and enable a mineral reserve analysis to be completed.
The continued exploration success and growing mineral resources at Mercedes will contribute to sustainability of higher throughput levels of 1,800 tonnes per day, higher production level of 140,000 ounces of annual production expected beginning in 2014 and the potential increase extension of mine life.
Pilar,
Pilar is a development stage project located in Goias,
The drilling is focused on the expansion of the Jordino resource both down dip, which has been shown to be open for more than two kilometres of dip length, and along strike to the south under younger cover rocks. In addition, exploration drilling will be completed at Maria Lazarus located approximately ten kilometres west of Jordino. Year-to-date, 24 drill holes have been completed totaling 11,227 metres and drill results confirm that growth in mineral reserves and mineral resources will continue in 2012.
The project is currently in development with production expected to begin in mid-2013. Annual production from the mine is estimated to be 140,000-150,000 ounces of gold.
Jordino
JD-540 intersected 0.43 metres of 66.4 g/t gold almost two kilometres south east of the current Jordino mineral resource under younger cover rocks. This is the only drill hole to test the potential strike extension to the south east and although the geology is not directly correlatable to Jordino, it indicates that the mineralized system continues over more than 2,000 metres along strike.
To view the Pilar Exploration JD 540 Hole Location Map, please visit the following link:
.
Maria Lazarus
This target is located approximately ten kilometres west of the Jordino ore body and is similar in geology and style of mineralization to Jordino. A series of historic garimpo activities have exposed a well mineralized structure along a strike length of at least three kilometres. Initial wide space exploratory drilling commenced in late 2011 and to date 18 diamond drill holes have been completed testing a strike length of 1,200 metres and a dip length in excess of 400 metres. Assay results from holes ML-005 through ML-013 have identified a main core of mineralization of 700 metres in strike length that has grades and widths similar to Jordino with widths of between 0.5-1.0 metre and grades between 3.61 and 18.25 g/t gold.
Results are shown in the table and figure below:
Maria Lazarus & Jordino Southeast | |||||
Hole No. | From (metres) | To (metres) | Length (metres) | Gold (g/t)(1) | Gold (g/t)(2) |
ML-001 | 55.00 | 56.00 | 1.00 | 4.25 | |
ML-002 | 93.00 | 95.00 | 2.00 | 4.47 | |
ML-003 | 41.00 | 42.00 | 1.00 | 2.89 | |
ML-004 | NSV | ||||
ML-005 | 474.47 | 475.34 | 0.87 | 4.04 | 4.16 |
ML-006 | 185.00 | 186.03 | 1.03 | 3.61 | 4.27 |
ML-007 | 146.68 | 148.32 | 1.64 | 1.55 | 1.41 |
ML-008 | Abandon | ||||
ML-008A | 23.63 | 24.95 | 1.32 | 3.44 | 4.50 |
Incl. | 24.19 | 24.95 | 0.76 | 4.80 | 6.26 |
ML-008A | 29.95 | 31.00 | 1.05 | 6.38 | 9.98 |
Incl. | 30.46 | 31.00 | 0.54 | 11.40 | 18.90 |
ML-009 | 593.00 | 594.97 | 1.97 | 2.06 | 2.44 |
Incl. | 594.47 | 594.97 | 0.50 | 4.09 | 4.71 |
ML-009 | 598.00 | 598.50 | 0.50 | 10.35 | 12.80 |
ML-009 | 601.35 | 601.87 | 0.52 | 4.30 | 4.77 |
ML-010 | 968.15 | 969.85 | 1.70 | 2.03 | 3.16 |
Incl. | 969.25 | 969.85 | 0.60 | 3.57 | 7.05 |
ML-011 | 740.43 | 741.00 | 0.57 | 21.10 | 18.25 |
ML-012 | 303.61 | 304.78 | 1.17 | 4.15 | 4.56 |
Incl. | 304.25 | 304.78 | 0.53 | 8.45 | 9.40 |
ML-013 | 120.26 | 120.80 | 0.54 | 4.62 | 4.25 |
ML-014 | NSV | ||||
ML-015 | NSV | ||||
ML-017 | 617.00 | 617.67 | 0.67 | 2.92 | 2.21 |
JD-540 | 767.89 | 768.32 | 0.43 | 66.4 | |
Cutoff: 1.5g/t Gold NSV: Not significant value |
(1) | Based on gold fire assay |
(2) | Based on gold screen fire assay |
The success of this early stage drilling effort at Maria Lazarus continues to confirm that the area surrounding Pilar is a cluster of mineralized zones which will contribute to Pilar’s ore feed or potentially could be developed as a multiple mine complex.
The Company has already increased the capacity of the mill by 30 percent from the feasibility study level and continues to assess potential increases to production and mine life with a strategic plan to fully utilize the increased capacity beginning in 2014.
2012 Exploration Program
Exploration continues to be a vital component of organic value creation. In 2012 the Company is expecting to spend
Quality Assurance and Quality Control
Yamana incorporates a rigorous Quality Assurance and Quality Control program for all of its mines and exploration projects which conforms to industry Best Practices as outlined by the CSE and National Instrument 43-101. This includes the use of independent third party laboratories and the use of professionally prepared standards and blanks and analysis of sample duplicates with a second independent laboratory. For additional information on these programs for Chapada and El Peñón please refer to the following two technical reports:
Qualified Persons
Sergio Brandão, P. Geo., Director of Exploration,
About Yamana
Yamana is a Canadian-based gold producer with significant gold production, gold development stage properties, exploration properties, and land positions in
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS: This news release contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation. Except for statements of historical fact relating to the Company, information contained herein constitutes forward-looking statements, including any information as to the Company’s strategy, plans or future financial or operating performance. Forward-looking statements are characterized by words such as “plan,” “expect”, “budget”, “target”, “project”, “intend,” “believe”, “anticipate”, “estimate” and other similar words, or statements that certain events or conditions “may” or “will” occur. Forward-looking statements are based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made, and are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those projected in the forward-looking statements.
These factors include the Company’s expectations in connection with the projects and exploration programs discussed herein being met, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating metal prices (such as gold, copper, silver and zinc), currency exchange rates (such as the Brazilian Real, the Chilean Peso, the Argentine Peso, and the Mexican Peso versus the United States Dollar), possible variations in ore grade or recovery rates, changes in the Company’s hedging program, changes in accounting policies, changes in the Company’s corporate mineral resources, risk related to non-core mine dispositions, changes in project parametres as plans continue to be refined, changes in project development, construction, production and commissioning time frames, risk related to joint venture operations, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, steel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, final pricing for concentrate sales, unanticipated results of future studies, seasonality and unanticipated weather changes, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation and the risk of government expropriation or nationalization of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, limitations on insurance coverage and timing and possible outcome of pending litigation and labour disputes, as well as those risk factors discussed or referred to in the Company’s annual Management’s Discussion and Analysis and Annual Information Form for the year ended
There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances or management’s estimates, assumptions or opinions should change, except as required by applicable law. The reader is cautioned not to place undue reliance on forward-looking statements. The forward-looking information contained herein is presented for the purpose of assisting investors in understanding the Company’s expected financial and operational performance and results as at and for the periods ended on the dates presented in the Company’s plans and objectives and may not be appropriate for other purposes.
CAUTIONARY NOTE TO U.S. INVESTORS CONCERNING ESTIMATES OF MEASURED, INDICATED AND INFERRED MINERAL RESOURCES
This news release uses the terms “Measured”, “Indicated” and “Inferred” Mineral Resources.
(All dollar amounts are expressed in
Contact:Lisa Doddridge , Vice President,
Company Name:Yamana Gold Inc.
Contact Title: Corporate Communications and Investor Relations
Phone: 416-945-7362 or 1-888-809-0925
Other1: [email protected]
Other2: www.yamana.com