Location

Aurcana Corporation (“Aurcana” or the “Company”) is pleased to report that the 2011 first quarter production figures for the La Negra mine in Mexico confirmed record silver production and La Negra is on track for a record year.

In July 2010, La Negra completed in time and budget a mine and mill expansion from 1000 tonnes per day (“tpd”) to 1500 tpd.

La Negra’s production increase was successfully supported by a 2010 diamond drilling program of 11,000 metres.

Aurcana has recently completed a lead concentrate circuit that is currently being tested, and will remove lead from the Copper concentrate. The success of the 2010 expansion and current metal prices has prompted engineering work on the design, cost and schedule for a second expansion to over 2000 tpd.

La Negra Mine Production




















































































































































Year


 


2007


2008


2009


2010


2011


 


unit


Year


Year


Year


Year


1st Qrt


Production


 


 


 


 


 


 


Ore mined


(WMT)


122,702


306,384


323,330


477,759


142,000


Ore milled


(MT)


149,578


297,867


300,952


422,603


127,231


Average grades


 


 


 


 


 


 


Silver


(g/t)


66


75


94


76


74


Copper


%


0.76%


0.79%


0.54%


0.47%


0.44%


Zinc


%


1.02%


1.08%


0.99%


1.18%


1.09%


Concentrate


 


 


 


 


 


 


Lead (March 2011)


(DMT)






108


Copper


(DMT)


4,100


9,151


9,036


11,655


2,994


Zinc


(DMT)


1,564


3,112


3,449


5,219


1,582


Contained metal


 


 


 


 


 


 


Silver in lead(March 2011)


(tr oz)






20,284


Silver in Copper


(tr oz)


228,201


514,853


749,442


838,077


219,991


Copper in Copper


(lbs)


1,891,832


4,136,865


3,432,671


3,686,534


1,028,965


Zinc in zinc


(lbs)


1,512,141


3,320,088


3,225,166


5,136,865


1,473,600


Mr. Lenic Rodriguez, President and CEO of the Company, commented: “The La Negra Mine is a success story for Aurcana. It has delivered consecutive years of increasing silver production and reduction in unit cost. The 2010 expansion of the mine and mill from 1000 to 1500 tpd, was very well timed for the rise in Silver and Copper prices.”

Shafter Silver Mine Project, Texas
Shafter Silver mine is currently in the fourth month of an 18 month construction program. The project is on budget and on schedule to go into production in May of 2012.

At the end of the first quarter 2011:



  • Earthmoving and site preparation is 60% complete and will be finished by the end of April. Pouring concrete foundations will commence in early May 2011;
  • Mine portal is excavated and ground support installed in preparation for mining commencing in mid April 2011;
  • The first of three sets of new Sandvik underground equipment has been delivered or is in transit;
  • An oversized ball mill has been procured and is currently being removed from its location in Florida and will be delivered to site in June 2011;
  • All key members of the project team are hired and on site;
  • Detailed engineering was started in October 2010 and is well in advance of construction; and
  • Ways of accelerating the project schedule are being investigated.

Technical Reports on Reserves and Resources for the La Negra Mine are available on the Company’s website at www.aurcana.com and filed on SEDAR.

About Aurcana Corporation:

Aurcana is committed to become a mid-tier silver producer. Annualized pure silver production is on schedule to exceed 5 million ounces (6.0 million ounces of silver equivalent) by year 2012. The reader should be cautioned the Company has not completed a feasibility study confirming the projected production capacity for La Negra and there is no certainty the Company’s plans will be economically viable.

ON BEHALF OF THE BOARD OF DIRECTORS OF
AURCANA CORPORATION
“Lenic Rodriguez”, President and C.E.O.

For further information, visit the website at www.aurcana.com:

P: (604) 331-9333 TF: (866) 532-9333 F: (604) 633-9179 E: [email protected]