Torex Gold Reports Positive Results from the 2024 ELG Underground Drilling Program
“Building off the success of the 2023 drilling program, which resulted in a two-year mine life extension, drilling at ELG Underground continues to deliver results that bolster our ability to continue to replace mined reserves. This, combined with the potential for EPO to come into the mine plan, supports our strategy of maintaining annual gold equivalent production above 450,000 ounces through 2033.”