Torex Gold Reports Q3 2023 Production Results
“The third quarter was challenging as the team pushed through the final months of the high strip, low grade phase of the open pit mine plan, which continued to require the processing of lower-grade and stockpiled material to top up the mill. As a result, quarterly gold production was 85,360 oz, which is lower than what was planned.”