Month: July 2021

Agnico Eagle Provides an Update on Exploration Results for H1 2021: Discovery of a New Mineralized Horizon 400m South of East Gouldie Deposit; Additional High-Grade Gold-Copper in Footwall Zone at Upper Beaver in Kirkland Lake; Exploration at Hope Bay Confirms Expansion Potential of Doris and Madrid Deposits; Drilling at Kittila Yields Deepest Ore Grade Intersection

Exploration drilling of the Amelia deposit is extending and validating the lateral continuity of high-grade gold and silver intercepts, with highlights including 2.7 g/t gold and 11 g/t silver over 33.9 metres at 395 metres depth, which includes 5.7 g/t gold and 15 g/t silver over 8.3 metres at 402 metres depth.

Gatos Silver Reports Record Tonnage and Metal Production During Second Quarter 2021

Stephen Orr, Chief Executive Officer, stated “CLG’s impressive Q2 mine and plant performance produced record results. Mine development during Q2 accessed the expected higher-grade ore forecast to be mined during 2021 and the plant production averaged a record 2,535 tonnes per day, above the design capacity of 2,500 tonnes per day. Record recoveries for silver, lead and zinc achieved in the quarter were also well above design.”

GSilver Drills 0.90m of 953 gpt AgEq within 8.10m of 173 gpt AgEq

COO Hernan Dorado remarked: “The main El Pinguico vein structure pinches and swells, occasionally showing widths of more than 8 meters – noteworthy and very attractive in the Guanajuato region. This vein is parallel / sub parallel to the San Jose vein, with the two veins appearing to widen and coalesce at depth.”

GR Silver Mining Reports Wide Gold and Silver Zones from the Final Drill Holes to be Incorporated into the Plomosas Mine Area Resource Estimation

GR Silver Mining President and CEO, Marcio Fonseca commented “This final batch of drilling results from drill holes PLI21-10 and 14, represent a step out of approximately 150 m to the north from the closest underground information in the Plomosas Mine Area. As a result, they confirm the presence of attractive gold and silver epithermal mineralization in unmined zones of the historic Plomosas Mine Area.”

Kootenay Silver Appoints Hans Smit, P.Geo. as Technical Advisor to Assist with Economic Evaluations

James McDonald, President and CEO, comments “We are working to update the mineral resource estimations and evaluate the potential economics of the two most advanced projects, La Cigarra and La Negra (Promontorio). Mr. Smit is well known for his experience and expertise in advancing projects from resource estimation through to feasibility and construction and we look forward to drawing on his expertise as we move these projects forward.”

Capitan Mining Drills 56.4m of 0.75 g/t AuEq Including 10.7m of 1.19 g/t AuEq at Capitan Gold Zone at the Peñoles Project

Capitan’s CEO, Alberto Orozco, stated: “We are very pleased with the continuity that the Capitan gold zone has shown with each batch of drill holes that we have released. This additional drilling has not only expanded the presence of gold mineralization in the Capitan zone, but it has also helped our geological team have a better understanding of the geology and structural controls for the mineralization at the Capitan gold zone.”

Americas Gold and Silver and the Ministers of the Mexican Government Announce Agreement to Reopen the Cosalá Operations

“I am very pleased that this agreement could be signed,” stated Americas Gold and Silver President & CEO Darren Blasutti. “Through extensive deliberations with senior Mexican ministers, certain union representatives, the will of our workers and the community and the President of Mexico, the agreement is a significant step to ensure the long-term stability of the operations by its signatories.”

All News