Day: April 6, 2021

Prime Reports Results Including 8.95 gpt Au and 74.5 gpt Ag over 4.5 Metres and 1.96 gpt Au and 63.6 gpt Ag over 18.7 Metres from Ongoing Drilling at Los Reyes

“At this early stage, we have extended the margins of known deposits, and the gold and silver grades encountered appear consistent with current resource grades. Drilling also gathered silver assay data in an area of the Project where limited silver assaying had occurred historically and was potentially underrepresented in our current resource.”

Torex Gold Granted Key Environmental Permit Amendment for Media Luna Project

Jody Kuzenko, President & CEO of Torex, stated: “We are very pleased to have the approval of the MIA modification in hand, which is a permitting milestone for the execution of our Media Luna early works program. While we had been permitted for early works activities on the north side of the Balsas River, this amendment extends permit boundaries and allows for the construction of key infrastructure on the south side of the river.”

All News