President Lawrence Page, Q. C. noted: “The present mineral resource estimate is based upon results derived from drill holes situate on the West side of the Cerro. Results from seventeen drill holes located on the East side of the Cerro, many containing high-grade mineralization, are not included in the 2019 Resource Estimate. Drilling currently being conducted on the east side of the Cerro is producing significant values of both oxide and sulphide mineralization, the results of which, together with results of the seventeen drill holes previously drilled, will be incorporated into an updated 43-101 Mineral Resource Estimate leading to further economic assessment studies incorporating all data later in 2021.”