Month: October 2020

Advance Gold Hits 2.15m of 664g/t Silver in Hole 15 and 1.3m of 5.45% Zinc in Hole 16 at Tabasquena Project in Zacatecas, Mexico

Allan Barry Laboucan, President and CEO of Advance Gold Corp. commented: “The first three holes into the 3500 metre continuous chargeability anomaly were focused at the southern end. Results from hole AGT-15 shows promising grades of over a half kilo per tonne of silver. Hole AGT-16 drilled 2200 metres to the north of AGT-15 also hit promising lead and zinc grades in a zone of semi-massive sulphides. It is clear we have a very large sulphide system at Tabasquena.”

Weir Is Exiting the Oil-and-Gas Industry With a $405 Million Sale to Caterpillar. Its Stock Is Soaring.

Perhaps most interesting is Weir’s confidence that focusing purely on mining—a historically dirty industry—is really a climate change play. As a mining technology company it could stand to benefit if global miners take commitments to reducing carbon emissions seriously. And Weir’s exposure to copper—crucial in electric vehicles and windmills—positions it well in the long term for a broader global shift to a renewable economy.

Kootenay Discovers Broad Area of Silver Mineralization at J-Z Zone Hosting New Hydrothermal & Stockwork System at Columba Project, Mexico

James McDonald, President and CEO of Kootenay stated: “We are excited about the resource and grade potential of these breccias and stockworks because they offer potential for both high grades and large tonnages. At the present time, we are drilling the previously undrilled areas of the E Vein, located 100 to 400 meters east of the F Vein. Drilling will then move onto the B and D veins to follow up on previous hits such as 628 gpt silver over 1.5 meters in drilling from last year.”

All News