Telson Reports Q3 2020 Production Results for Campo Morado Mine
“After losing production as a result of COVID-19 pandemic government mandatory shut down earlier this year and dealing with operational difficulties largely related to the SAG mill failures, with the new liner design fully installed and performing above expectations, we now have Campo Morado Mine operating at full capacity and achieved a very good month of production in September”, states Ralph Shearing, president and CEO of Telson.