Month: August 2020

Aztec Commences Phase 1 Drill Program on the Tombstone Property, Tombstone Silver Mining District, Arizona

Aztec CEO, Simon Dyakowski commented, “Since acquiring an option on the Tombstone project, Aztec has generated several exciting new targets through its methodical evaluation of historic exploration and production data followed by systematic exploration programs. The Phase 1 RC drill program represents Aztec’s first opportunity to test for shallow, bulk tonnage, heap leach, gold-silver oxide mineralization”.

Fortuna Reports Consolidated Financial Results for the Second Quarter 2020

Jorge A. Ganoza, President and CEO, commented, “Although the unprecedented volatility and government mandated shutdowns during the second quarter have resulted in a $5.7 million net loss, our cost and investment reduction plans have allowed us to maintain a neutral free cash flow position from ongoing operations.”

Vizsla Makes Second Discovery Drilling 1,245 G/T Silver Equiv. Over 1.5 Metres Within 421 G/T Silver Equiv. Over 6.75 Metres at Panuco, Mexico

Vice President of Exploration, Charles Funk, commented: “This discovery of high grades and good widths at San Carlos further demonstrates the potential of the Panuco project. With discoveries at two vein corridors over 6 km apart and four drill rigs in operation, the scale of the district is being revealed. Drilling under existing workings continues to prove a viable method for new discoveries. San Carlos has been mined down to the water table and underground sampling defined high grade mineralization that was open beneath the mine workings and this hole intersected the vein 55m below known workings.”

All News