Day: May 26, 2020

Sonoro Issues Revised Cerro Caliche Project Development Report

Based on the methodologies and modelling set out in the Revised Report, the Company believes that the 50,000 meters of drilling planned for 2020 and 2021 will enable the Company to not only outline additional gold and silver mineralization where zones of mineralization are currently open in one or more directions, but also to evaluate 16 surface defined gold mineralized zones that have not previously been drill tested.

Kootenay Intercepts High Silver Grades 2,010 gpt Over 1 Meter Within 762 gpt Over 2.8 Meters & 865 gpt Over 2 Meters withing 317 gpt Over 6 Meters – Defines New Hang Wall Structure at Columba Project, Mexico

Kootenay Silver Inc. is pleased to announce assay results from an additional four holes at the Columba high-grade silver project located in Chihuahua State, Mexico. These holes are the remaining 4 of 10 holes completed from the 2020 drill program before the COVID-19 work stoppage.

All News