Azure Minerals Ltd. – Quarterly Activities Report for Period Ended 30 June 2018
Update on exploration activities and results for the Oposura, Sara Alicia and Alacrán Projects.
Update on exploration activities and results for the Oposura, Sara Alicia and Alacrán Projects.
We are excited to have discovered what appears to be the southern extension of the historic Promontorio-Quintera vein. This significant vein is abruptly cut-off by a fault while still in high-grade mineralization. The extension has the potential to host virgin mineralization at depth and at grades similar to those that were historically mined, stated Darrell Rader, President and CEO of Minaurum.
The Canadian mining firm First Majestic Silver Corporation has announced the temporary suspension of work at its México state silver mine La Guitarra, located in the municipality of Temascaltepec.
La empresa canadiense afirmó que la situación económica complica la operación ordinaria de la explotación mineral.
GoGold Resources Inc. (TSX: GGD) announces sales of 382,150 silver equivalent ounces for the quarter ended June 30, 2018, which was an increase of 34% over the previous year. The Company produced 163,991 ounces of silver and 1,630 ounces of gold for 292,273 silver equivalent ounces at the Parral project during the quarter, a 2% decrease from the prior year.
Grupo México secured a $37 Million and a $147 Million Loans with HSBC.
IMPACT Silver Corp. is pleased to announce the discovery of a new zone in the San Ramon mine. The new San Ramon Deeps #2 Zone was discovered through an underground drill program testing the southern extension of the vein system. High-grade silver results have been intersected 100m south of current mining levels of the San Ramon Mine in the Royal Mines of Zacualpan Silver District, central Mexico. The zone remains open for further extension vertically above for nearly 300 meters and to the south.
Mexico Mining Center © 2021 / All Rights Reserved