Day: June 29, 2018

Prize Mining Announces $4 Million Brokered Private Placement

The Company intends to use the net proceeds of the Offering for continued drilling, geological, engineering and metallurgical investigations and associated consulting services on its Manto Negro Copper Project located in Coahuila State, Mexico.

Sierra Metals Defines 40-Metre Wide, High-Grade Silver Stockwork Area Which Remains Open to Depth and Width Within the Santa Rosa de Lima Vein at its Cusi Mine, Mexico

Alonso Lujan, Vice President Exploration at Sierra Metals commented: “ Today’s press release demonstrates the existence of increased high-grade silver mineralization at Cusi with the potential for further resource development, as this area remains open at depth and along strike. The increased potential resources defined today will allow the Company to utilize the highly productive exploitation method of sublevel caving and help achieve its economic objectives at the Cusi Mine. …”

Aloro Receives Permit to Drill and Construct Road Access

The old permit was for core drilling with a man portable rig, did not allow for the construction of an access road and was due to expire on July 30, 2018. The new permit will allow for the drilling of 12 drill holes, the building of 12 drill sites 14 x 7 meters suitable for using a reverse circulation drill, and the construction 3,693 meter access road 7 meters wide in order to reach the 12 new locations.

All News