Day: April 13, 2016

Almaden Files Amended Technical Report

Almaden Minerals Ltd. announces that as a result of a review by the British Columbia Securities Commission, we are issuing the following news release to clarify our disclosure. The review identified filing and disclosure issues with the technical report titled, NI 43-101 Technical Report Preliminary Economic Assessment of the Ixtaca Project, Mexico filed on January 22nd, 2016. The Company has amended the report accordingly, which has now been refiled on SEDAR as an amended report. The Company wishes to clarify that the amendments are not material changes and the Report’s data, inputs, interpretation, conclusions and results all remain unchanged. The items amended according to NI 43-101 are listed below in order of appearance in the original report.

Defiance Receives $1.2 Million From Warrant Exercise

“We are very pleased with this strong show of support from our existing long-term shareholders as we continue to move forward with our strategy to further delineate the San Acacio Silver Deposit,” stated Bruce Winfield, President and CEO. “San Acacio and the surrounding region is a prolific silver producing area which has a long history of silver production. We are encouraged by the results we have realized to date and with our strengthened balance sheet, expect to continue to move the asset forward and demonstrate its significant resource potential.”

Great Panther Silver Reports First Quarter 2016 Production Results

“Great Panther’s first quarter production of 1.01 million silver equivalent ounces is in-line with our annual guidance, and reflects our plans for modest growth and further focus on operational efficiency in 2016 after achieving 30% growth last year”, stated Robert Archer, president & CEO. “The increase in gold production and decrease in silver production are a direct result of the rising production from San Ignacio, which has a higher gold to silver ratio, and pillar recoveries at the Guanajuato mines. Our team’s continued pursuit of greater efficiencies and better grade control is another important factor in the overall success for the quarter and is reflected in more ounces produced from less tonnes.”

Fortuna reports production of 1.6 million ounces of silver and 9,264 ounces of gold for first quarter 2016

Jorge A. Ganoza, President and CEO, commented: “Silver and gold production exceeded guidance for the quarter. San Jose’s outperformance was driven by higher head grades, increase in milled tonnes, and better metallurgical recoveries. Caylloma reached the new mill throughput rate of 1,430 tpd at the end of March.” Mr. Ganoza continued, “Mill expansion from 2,000 tpd to 3,000 tpd is progressing as planned with commissioning scheduled for July 2016. At that point, the San Jose Mine will rank among the top thirteen primary silver producing mines in the world, increasing Fortuna’s consolidated silver and gold annual production to approximately 9 -10 million ounces of silver and 52 – 53 thousand ounces of gold.”

All News